Basic Info. Model NO.:TS20 PLC Pullution Sources:Solid Waste Processing Processing Methods:Combustion Export Markets:Global Additional Info. Trademark:CLOVER Packing:Full Container Standard:20 kg per hour Origin:China Production Capacity:1000 Sets Per Year Product Description TS version PLC incinerator is latest layout for waste treatment, include health care waste, animal cremation and other solid waste. This gear quality structural for […]
Basic Info. Model NO.:TS50 PLC Pullution Sources:Solid Waste Processing Processing Methods:Combustion Export Markets:Global Additional Info. Trademark:Clover Packing:Full Container Standard:50 kg per hour Origin:China Production Capacity:1500 Units/Year Product Description Items/Model TS50(PLC) Burn Rate 50 kg/hour Feed Capacity 100kg Control Mode PLC Combustion Chamber 560L Internal Dimensions 100x80x70cm Secondary Chamber 280L Smoke Filter Chamber Yes Feed Mode […]
Basic Info. Model NO.:TS20 PLC Pullution Sources:Solid Waste Processing Processing Methods:Combustion Export Markets:Global Additional Info. Trademark:CLOVER Packing:Full Container Standard:20 kg per hour Origin:China Production Capacity:1000 Sets Per Year Product Description TS model PLC incinerator is newest design for waste treatment, include medical waste, animal cremation and other solid waste. This gear quality structural for types […]
Basic Info. Export Markets:Global Additional Info. Trademark:CLOVER Packing:Wooden Carton Origin:Nanjing Product Description Key Features: * All versions with Dual combustion chamber. *based on order * Stainless Steel chimney/stack, long life. *based on order * High temperature, long life of incinerator. * Free or minimal installation on site. * High speed, from 10kgs to 500kgs per […]
Application : four islands in Croatia Capacity/island : 4000 kg/day ; 25000 kg/day ; 31000 kg/day ; 48000 kg/day Burning temperature – over 12000C Two chambers – minimum Emissions – dioxin and heavy metaly – better then Kyoto protocol Emission – monitoring system Waste unloiding – directly from waste track to incinerator Burn Rate(Average kgs/hr) 25 kg primary chamber 800 degree secondary chamber 1000 degree chimney standard shredder separately Autoclave or microwaves separately temperature monitor attached outside of machine operating Fuel and electric – Toxic and dangerous wastes, – Medical pharmaceutical and hospitable liquids Wastes – Domestic garbage – Electric and electronic wastes – Industrial wastes – In General, all type of wastes and garbages 1) working now in new order for Nigeria though our company for Yd-300 x 2 units , this is a job in hand in our customer located in dubai 2) the customer also want also to buy a fuel bulk storage tank to be for 3 days continuous operation so we hope also you can manufacture it so please give me the best price for fuel bulk storage tank to be for 3 days continuous operation for YD-300 3) installation must be in the site in Nigeria by your company ,as i know your price rate which you sent to be before 4) what is the best price CIF Nigeria in lagos sea port as i have only price for cif dubai 5) 150 pcs Waste Containers (820 L) fully compatible with the incinerator and clinical waste container washing system. please send me the price and catalog for this item 6) also they need Automatic Clinical Waste Container Washing System complete in every respect and fully compatible with containers price and catalog 7) 2 units 1.5 tonne Fork Lift ( if you know good price and quality company in china) 8) 1 unit Clinical Waste Container Vehicles complete in every respect and fully compatible with containers. 9) Spare Parts For 2 Years Operation & Maintenance for YD-300 and for the above machines 10) all parts , pipe work electrical work and civil work for incinerator must be provided and material must be quoted The highest temperature that the filter bag can operate continuously is 260C. In order to add a bag house using our filter products, you would need to add a water cooling tower or other method to reduce the inlet temperature at the baghouse to less than 260C. If you cannot lower the temperature below 260C, then we cannot utilize our membrane filter bags.
Application : four islands in Croatia Capacity/island : 4000 kg/day ; 25000 kg/day ; 31000 kg/day ; 48000 kg/day Burning temperature – over 12000C Two chambers – minimum Emissions – dioxin and heavy metaly – better then Kyoto protocol Emission – monitoring system Waste unloiding – directly from waste track to incinerator Burn Rate(Average kgs/hr) 25 kg primary chamber 800 degree secondary chamber 1000 degree chimney standard shredder separately Autoclave or microwaves separately temperature monitor attached outside of machine operating Fuel and electric – Toxic and dangerous wastes, – Medical pharmaceutical and hospitable liquids Wastes – Domestic garbage – Electric and electronic wastes – Industrial wastes – In General, all type of wastes and garbages 1) working now in new order for Nigeria though our company for Yd-300 x 2 units , this is a job in hand in our customer located in dubai 2) the customer also want also to buy a fuel bulk storage tank to be for 3 days continuous operation so we hope also you can manufacture it so please give me the best price for fuel bulk storage tank to be for 3 days continuous operation for YD-300 3) installation must be in the site in Nigeria by your company ,as i know your price rate which you sent to be before 4) what is the best price CIF Nigeria in lagos sea port as i have only price for cif dubai 5) 150 pcs Waste Containers (820 L) fully compatible with the incinerator and clinical waste container washing system. please send me the price and catalog for this item 6) also they need Automatic Clinical Waste Container Washing System complete in every respect and fully compatible with containers price and catalog 7) 2 units 1.5 tonne Fork Lift ( if you know good price and quality company in china) 8) 1 unit Clinical Waste Container Vehicles complete in every respect and fully compatible with containers. 9) Spare Parts For 2 Years Operation & Maintenance for YD-300 and for the above machines 10) all parts , pipe work electrical work and civil work for incinerator must be provided and material must be quoted The highest temperature that the filter bag can operate continuously is 260C. In order to add a bag house using our filter products, you would need to add a water cooling tower or other method to reduce the inlet temperature at the baghouse to less than 260C. If you cannot lower the temperature below 260C, then we cannot utilize our membrane filter bags.
Mobile Diesel Fired Incinerator in container, supplied with the following specifications: complete with constant ventilation fans for extraction, factory installed inside one 20ft ISO container complete with lighting, ventilation fan, fire security, 3 access doors, and a 1200 litre fuel tank complete with a piping. Fully containerised mobile waste management solution for medical, animal, and industrial waste applications. Installed in Container (ISO) : 20” or its nearest equivalent model “ Tender Technical Specification Destruction rate of 50kg/hr Hot Hearth Principle Refractory insulation: a. Silicon carbide floor b. Minimum 22mm insulation thickness c. Brick lined Refractory insulation d. Three layers of refractory insulation e. Temperature Rating 1650 deg.C f. 42% alumina fire bricks Primary Chamber: a. 120Kw Burner b. Dedicated independent fan system, damper controlled. c. Thermostatic Sensor d. Dimensions – 700mm x 700mm x g00mm e. Square Chamber with curved floor for liquid centralization Hot Hearth Chamber: a. 120Kw Burner b. Thermostatic Sensor c. Minimum Temperature of 1100 deg.C as per WHO guidelines. d. Two second retention time – Proven with CFD modeling. Steel Construction: a. constructed from 8mm & 1Omm steer plate b. Painted two pack paint system, red with black flashing Control Panels: a. Door dimensions 700mm x 700mm b. Front mounted ash collection box. Control Panels: a. AiController b. Plug and play c. Threezone monitoring of: i)Primary chamber ii) Secondary chamber iii) Hot hearth d. Digital display e. Burner on-off indication lights f. Timer Chimney: a. Mild steel painted red b. Refractory insulated with 50mm of insulation. Unit Dimensions: 1840mm x 1 ‘1 50mm x 1950mm high. Safety: a. Burner door cut-off switches b. Fire valve fitted to fuel system c. Maximum noise at 1m x g0 decibels d. Exterior temperature 70 deg.C Max
Mobile Diesel Fired Incinerator in container, supplied with the following specifications: complete with constant ventilation fans for extraction, factory installed inside one 20ft ISO container complete with lighting, ventilation fan, fire security, 3 access doors, and a 1200 litre fuel tank complete with a piping. Fully containerised mobile waste management solution for medical, animal, and industrial waste applications. Installed in Container (ISO) : 20” or its nearest equivalent model “ Tender Technical Specification Destruction rate of 50kg/hr Hot Hearth Principle Refractory insulation: a. Silicon carbide floor b. Minimum 22mm insulation thickness c. Brick lined Refractory insulation d. Three layers of refractory insulation e. Temperature Rating 1650 deg.C f. 42% alumina fire bricks Primary Chamber: a. 120Kw Burner b. Dedicated independent fan system, damper controlled. c. Thermostatic Sensor d. Dimensions – 700mm x 700mm x g00mm e. Square Chamber with curved floor for liquid centralization Hot Hearth Chamber: a. 120Kw Burner b. Thermostatic Sensor c. Minimum Temperature of 1100 deg.C as per WHO guidelines. d. Two second retention time – Proven with CFD modeling. Steel Construction: a. constructed from 8mm & 1Omm steer plate b. Painted two pack paint system, red with black flashing Control Panels: a. Door dimensions 700mm x 700mm b. Front mounted ash collection box. Control Panels: a. AiController b. Plug and play c. Threezone monitoring of: i)Primary chamber ii) Secondary chamber iii) Hot hearth d. Digital display e. Burner on-off indication lights f. Timer Chimney: a. Mild steel painted red b. Refractory insulated with 50mm of insulation. Unit Dimensions: 1840mm x 1 ‘1 50mm x 1950mm high. Safety: a. Burner door cut-off switches b. Fire valve fitted to fuel system c. Maximum noise at 1m x g0 decibels d. Exterior temperature 70 deg.C Max
Medical Waste Incinerator Purpose For a complete destruction of waste from various hospital services by heat treatment of high temperature in accordance with EU standard on emission requirement. -Waste from health care activities -Infections waste, laboratory cultures, waste form operation room isolations material in contact with infected patients, waste potentially being infected by pathogenic agents. -Pathological waste, human fragments, blood, fetus, all body fluids, human tissues. -Sculpts, needles, infusion sets, blades, glass -Pharmaceutical waste. -Chemical waste laboratory reagents, disinfectants -Expired drugs. -Low radiation radioactive element. Medical waste incinerator: – Ecological Requirement – No odor -No fume -Definitive treatment of waste Medical waste incinerator: – Manufacturing Standards -UL,CE, ASME, ISA EURO emission standard 1.Medical waste incinerator Construction – CS plate shells, FB reinforcement, cast refractory linings, Insulation and 14 gage aluminum jacket. Type of fuel – Oil fired (Diesel) Burning Capacity – 250kg/hr and moisture up to 80%. Duration -8-16/Continuous Average fuel consumption – Very little as much as possible Control Type – PLC based operation Operating Temperature – Primary chamber 800oc ± 50 – Secondary Chamber 1050oc ± 50 Size of incinerator – Not more than 15mx7.20m Chimney – Ø630x25meter height and 7mm thick CS. Combustion efficiency- 99% Mode of waste handling- Semi-automatic via ram loader. Mode of ash handling – Semi-automatic via grate and ash trolley. Pollution control equipment- Dry settlement zone Doors- 1-waste charging door in primary chamber 1-clinker door in primary chamber 1-ash trolley access door in primary chamber 1-clean out door in secondary chamber Burner – 2- ignition burner in primary chamber 2- after burner in secondary chamber. Type- package mono block-fully automatic Type of burner operation- modulation control Forced draught fan- 1-primary air fan 1-secondary air fan Fuel storage tank – Capacity- 2500liter above ground – Material-6mm thick mild steel – 2-diesel pump, gate valve, safety valve, strainer Pipe, pressure gage, check valve, control board Level indicator. Etc Refractory/insulation thickness- not less than 225mm Ram loader capacity- 0.75m3 Electrical supply- 380v/3ph/50 Hz Finish and painting type- powder coated Audio/ visual alarm system- burner lockout, overload fault Electrical accessories- primary and secondary chamber temperature […]
Medical Waste Incinerator Purpose For a complete destruction of waste from various hospital services by heat treatment of high temperature in accordance with EU standard on emission requirement. -Waste from health care activities -Infections waste, laboratory cultures, waste form operation room isolations material in contact with infected patients, waste potentially being infected by pathogenic agents. -Pathological waste, human fragments, blood, fetus, all body fluids, human tissues. -Sculpts, needles, infusion sets, blades, glass -Pharmaceutical waste. -Chemical waste laboratory reagents, disinfectants -Expired drugs. -Low radiation radioactive element. Medical waste incinerator: – Ecological Requirement – No odor -No fume -Definitive treatment of waste Medical waste incinerator: – Manufacturing Standards -UL,CE, ASME, ISA EURO emission standard 1.Medical waste incinerator Construction – CS plate shells, FB reinforcement, cast refractory linings, Insulation and 14 gage aluminum jacket. Type of fuel – Oil fired (Diesel) Burning Capacity – 250kg/hr and moisture up to 80%. Duration -8-16/Continuous Average fuel consumption – Very little as much as possible Control Type – PLC based operation Operating Temperature – Primary chamber 800oc ± 50 – Secondary Chamber 1050oc ± 50 Size of incinerator – Not more than 15mx7.20m Chimney – Ø630x25meter height and 7mm thick CS. Combustion efficiency- 99% Mode of waste handling- Semi-automatic via ram loader. Mode of ash handling – Semi-automatic via grate and ash trolley. Pollution control equipment- Dry settlement zone Doors- 1-waste charging door in primary chamber 1-clinker door in primary chamber 1-ash trolley access door in primary chamber 1-clean out door in secondary chamber Burner – 2- ignition burner in primary chamber 2- after burner in secondary chamber. Type- package mono block-fully automatic Type of burner operation- modulation control Forced draught fan- 1-primary air fan 1-secondary air fan Fuel storage tank – Capacity- 2500liter above ground – Material-6mm thick mild steel – 2-diesel pump, gate valve, safety valve, strainer Pipe, pressure gage, check valve, control board Level indicator. Etc Refractory/insulation thickness- not less than 225mm Ram loader capacity- 0.75m3 Electrical supply- 380v/3ph/50 Hz Finish and painting type- powder coated Audio/ visual alarm system- burner lockout, overload fault Electrical accessories- primary and secondary chamber temperature […]