Day: March 19, 2021

Australian combustion engineering proprietary 5 25kg/hour dual chamber(LPG) incinerator or equal approved. incinerator casing to be mild steel with 125mm refractory lining including primary and secondary chamber, insulated draft section above secondary chamber, package burners, digital temperature control systems, ash rake and poke, second door in primary chamber, manual loading chute, semi automated operated counter […]
30 August 2013 Last updated at 21:18 BST Five councils in south east Wales have formed a partnership to deal with black bag waste in a bid to cut down on rubbish going to landfill. The authorities aim to incinerate waste which cannot be recycled and convert it into power in a new project which […]
Biomedical Waste                    Any solid or liquid waste which may present a threat of infection to humans including non-liquid tissue, body parts, blood or blood products and body fluids, laboratory and veterinary waste which contains human disease- causing agents, and discarded sharps (i.e. syringes, needles, scalpel blades).   Bottom Ash                                 The course non-combustible and unburned material […]
Incinerator Of Burning Capacity 30 kg/hr = 1 No The Incineration System comprises of: I. Main Incinerator with A. Refractory lined Primary and Secondary Chamber. B. Refractory lined main charging door and ash cleaning door. II i. 1 No. fully automatic oil burner for primary chamber. ii. 1 No. fully automatic oil burner for secondary […]
Burning Capacity: 125 kg minimum/time (3-6times/day), double chamber, double combustion system Imputing door Mouth Width (mm): 760*760 (approx.) Chimney External Diameter (mm): 300 ± 10 Combustion Improver Device: 0.11kw, Fuel consumption: 7kg/ hour (max) Re-Burning Device: Oil consumption: 5kg/h, 0.37kw, Oil consumption: 10-20kg/h Voltage: 380v/220v AC, Warranty: 1 Year, 50 Hz Per your advertisement for […]