● Able to drop 25-30kg per hour ● Contain 2 chambers to ensure significant decline in exhaust ● Be capable of temperature degree in series of 800c to 1000c ● Low upkeep style ● Has to be Fuel ● Required greater than 15amp 220- 250V power ● kW Intake power use to be specified ● […]
The purpose of the start-up burner is to ignite waste materials and to maintain the prescribed minimum temperature in the primary chamber. It shall be mounted in the lower part of the primary chamber. The start-up burner shall function automatically when:- – Pre-heating is completed, or after reaching the adjustable minimum temperature in […]
the entire carcass of animals (cattle, steeds, Sheep, pigs, and more), along with normally contaminated materials Products in the gas stove. ? Opening Doors – – – – the closure as well as additionally dependency automatic system, Which are dealt with from another area by the operator. ? made to work in long mode in […]
1. The double chamber incinerator shall ideally be made. Air supply in the primary and secondary chamber shall be controlled in between 30% -80% as well as 170% -120% of stoichiometric amount specifically. Circulation meter/suitable circulation measurement tool shall be supplied on the key and second air ducting. The combustion air shall be provided via […]
1. SCOPE OF FEATURE The work specified in the agreement will certainly consist of. 1. Supply, place as well as assign a heater as given in the technological specifications 2. Specification for adherence to OSHA along with other legal demand associating with Health and wellness of staff members throughout execution of the works covered in […]
The temperature is over the minimum and under the maximum required temperature (e.g 1150?C) of the thermal reactor (partial load). When switching off, only the solenoid valve for the fuel supply closes, the burner fan stays on to cool and protect the burner head. The reactor burner shall be modulating burner with pre-ventilation […]
Burning Capacity: 125 kg minimum/time (3-6times/day), double chamber, double combustion system Imputing door Mouth Width (mm): 760*760 (approx.) Chimney External Diameter (mm): 300 ± 10 Combustion Improver Device: 0.11kw, Fuel consumption: 7kg/ hour (max) Re-Burning Device: Oil consumption: 5kg/h, 0.37kw, Oil consumption: 10-20kg/h Voltage: 380v/220v AC, Warranty: 1 Year, 50 Hz Per your advertisement for […]
heavy Duty Steel casing High Quality refectory lining & insulation 1 x Diesel fired ignition burners operated on / off Front Loading Door (safety catch Separate Ash removal Door 2.7 CONTROL UNIT The entire processing cycle and the combined effect of the individual components of the incinerator shall […]
Equipment Access Openings: Arrange all equipment and piping to allow access to openings without disassembly of equipment or piping. Provide space which permits full opening of all doors, panels, and other access openings. Operating Space: Do not reduce or alter personnel working spaces shown except with prior approval of Resident Engineer. Fuel Oil […]
High Temperature Waste Incinerator Model D. MB 750XL Burn Rate-150Kg/hour minimum Weight(Kg)-4000kg Secondary Chamber (double chamber with post-burning) Gas Retention Time 2 second Fuel Diesel Power Supply for control box 220V-240, single phase 50-60Hz Minimum operating temperature 1200 oC One year spare parts package for complete maintainability 10m hose pipe. 1100 litre fuel Tank +pipe […]