Fully automatic sequential control provided by internal PLC system providing control of: Secondary chamber pre-heat Burn cycle (variable) Cool down cycle Fuel Options Diesel, LPG, Natural or Bio Gas. Typical Fuel Consumption Diesel: 8 / 10 litres per hour Liquid Propane Gas: 6 / 8 litres per hour Natural Gas: 7 / 9 Nm3 per […]
Programming controls. Programming controls should be verified as controlling and cycling the unit in the intended manner. Proper prepurge, ignition, postpurge, and modulation should be verified. A stopwatch should be used for verifying intervals of time. ? Fuel supply controls. The satisfactory operation of the fuel control solenoid valves for all conditions of operation and […]
Medical waste is posing a growing problem all over the world, jeopardizing the health of staff, patients, disposal workers and anyone else coming into contact with the often hazardous materials discarded by hospitals and other healthcare sites. Hospital waste varies from site to site and the biggest challenge is to dispose of this wide range of waste streams. Incineration is still the preferred way to process medical waste without endangering the heath patients, staff or anyone else coming into contact with them. Clinical waste is costing more and more to dispose of safely. Health Clinics and Health center can now handle their own waste streams using one of our specialist medical incinerators. Destroying hazardous waste at source is by far the most effective and efficient way of handling waste that could potentially spread diseases or viruses. Requirement 20% -25% of the full waste created by medical treatment facilities is associated to as hazardous and also might develop a selection of health as well as environmental threats if not managed and also harmed in a correct means. HICLOVER is now offering a full range of medical waste incinerators, designed to provide efficient waste destruction, utilizing best available technologies and environmentally friendly process. Due to the secondary chamber with its 2 second retention period, our medical incinerator range is well suited to process medical waste. Our products make sure reliable, neat as well as very easy disposal of […]
I also research their product details and find it don’t require fuel and also not require fan blower but that incinerator can only burn waste with 30%-40% humid. I see if your products can burn waste with 30%-40% humid without fan blower and more 40% humid require fan (Optional solution) which lead us to kick […]
Incinerate: medical waste and general waste Capacity to burn waste: 400-500kg/hr Fuel: Diesel Fuel Consumption: 10 liters/hr maximum Incineration temperature: 950-1300 degrees centigrade Casing: thick (min 5mm) stainless steel casing and fully insulated to withstand sea humidity Voltage 220/240v or 380/415V Frequency 50Hz Feeding: Automatic Ash/leftovers removal: Automatic Flue gas filtration system: Yes Thus, […]
Incinerator dual chamber with capacity 1.5 m3/batch or 6 m3/ day, digital thermocontrol range 0‐1200 C, thermocouple, air supply capacity 10m3/ minute, power consumption 1.2kWH/ hour, power 3 phase with netral, cooling water sprinkler capacity 5L/ minute, completed with refractory (insulation, castable, ceramic blanket) and PLC SUPPLY, INSTALLATION AND COMMISSIONING OF WASTE INCINERATOR – TECHNICAL […]
Flue Gas Cleaning System ? Wet Scrubber ? Electrostatic precipitation in combination ( Optional: Rate to be quoted separately) 7 Chimney Height 10m (minimum) ? Total duration of the supervision of installation, testing and commissioning works shall not exceed 2 weeks. 2.11 Commissioning […]
Supervision of installation of the new incinerator set shall be provided by the successful Bidder while labour and heavy duty equipment shall be provided by CEB. ? The successful Bidder shall submit to CEB, prior to shipment of the incinerator set, its procedures for the installation of the incinerator and exhaust chimney. This […]
The successful bidder shall deliver the incinerator skid in a container. The container will be emptied by CEB and returned to the successful bidder / or to its shipping agent. A containerized solution is also acceptable. Electrically operated 220 volt ( 60 Cycle – 1 phaze ) Able to complete burning material that turns to […]
An operating test should be conducted to ensure that all of the control components have been properly installed and that all parts of the incinerator, including controls and safety devices, are in satisfactory operating condition. The requirements for prepurge and time between restarts should be verified. The test should include but not limited to the […]