Day: May 2, 2021

30kgs rate 60kgs feed oil and gas burner small waste incinerator for Afghanistan Machine Working mode Oil or Gas + Power Voltage 220V Oil consumption (lit/hour) Average 13.3lit/hour/chamber Gas consumption (NG) (m3/hour) 16.0 (m3/hour) (NG) Gas consumption (LPG) (m3/hour) 11.7 (m3/hour) (LPG) Burning rate Average 30kg/hour Feed mode Manual Primary Combustion chamber 360 Liters Secondary Combustion […]
Layout CA-200 Picture Burning Rate Ordinary 100 kgs/hour Key Burning Chamber 2000 Liters Extra Burning Smokeshaft Yes Feed Setting Guidebook Voltage 220V Power 3.0 Kw Fuel Kind Diesel Oil Heater Italy Original Oil Use (Diesel Oil) Normal 53 kg/hour Inside Dimensions 230 x 100 x 90cm (key chamber) External Dimensions 290 x 200 x 170cm […]
Heater for health care facility waste surveillance with the adhering to attributes: – – In high temperatures( pyrolytic burner 2 chambers with temperatures varying from 950 º C to 1320 º C; – – Capability to damage of 400 to 600kg per hr; – – Effective in ruining germs; – – Drain ash; – Drain […]
Hospital Waste Management as well as Competitive prices as Pakistan is a competitive market. We have a complete setup with Office, Customer Relations, Import / Export, Biomedical Department, Application Support Department & Project Designing Department.Description        Minimum Requirements Design standard    Multiple chamber incinerator to the design of EPA  standards, Air pollution control Description of the […]
1 Burner 30 =KG burn/h as well as also it need to have a Scrubber. 2 Heater ought to have Electric Plastic Shredder for reducing of glass container, surange of Drug. 3 Heater need to have Electric Auto Clave or Microwave for Dis Infection individually with burner. 4 Incinerator requires to have Double Chambers initially […]
HICLOVER Top Feeding Door Waste Incinerators ▲▲▲Large Feeding Door ▲▲▲Better for Animal Waste Cremation ▲▲▲HICLOVER Brand Section ***Primary Combustion Chamber ***Secondary Combustion Chamber ***Smoke Filter Chamber ***Optional Wet Scrubber System(1 section or  3 sections) Phone: +86-13813931455(whatsapp/wechat)Website: http://www.hiclover.com/  Email: [email protected]Email: [email protected]   Nanjing Clover Medical Technology Co.,Ltd. Items Side Loading Door Top Loading Door Cost Cheap High cost Manufacture Tech. Easy A litter difficult […]
the incinerator can be made use of to do away with Clinical waste IV, used needles, utilized syringes, scalpels, made use of dressing product, private security gadgets like gown, gloves and so on truncated body components, excreta from clients and also various other research laboratory waste.incineration tools that can deal with a mix of clinical […]
CONTAINERIZED BURNER FOR INCINERATING HAZARDOUS AND NON HAZARDOUS WASTES (BOTH DOMESTIC In Addition To INDUSTRIAL) AT A MINIMUM COST OF 300KG/HR WITH THE ABIDING BY DEMANDS: Ø PRIMARY CHAMBER VOLUME 7.2 M ³ Ø BURNING CAPABILITY 300Kgs/hr. Ø PRIMARY CHAMBER TEMPERATURE LEVEL 850 ⁰ C AND ALSO SECONDARY CHAMBER TEMPERATURE LEVEL 1100 ⁰ C Ø […]
Stack: Type:  Wire Supported MOC:  Mild Steel of ISstd Height :3 Meters or more • PROCESS AT LEAST 1 METRIC TON OF WASTE PER DAY • OPERABLE BY 1 PERSON, WITH NO TRAINING REQUIRED • REGULAR MAINTENANCE CAN BE COMPLETED BY 1 PERSON WITH LIMITED TRAINING • REGULAR MAINTENANCE SHOULD NOT EXCEED 1-HOUR PER DAY […]