medical waste 实时更新 ⋅ 2021年7月23日 新闻 Why masks for COVID-19 don't need to go in biohazard bins PolitiFact Medical waste containers, or biohazard bins, are used by health care facilities for items contaminated with hazardous infectious materials such as … 标记为不相关 Coastal erosion threatens Senegal's rock climbing clique Reuters These days, it's a dusty construction site […]
Basic Info. Model NO.:pet incinerator manufacturers Export Markets:Global Product Description TS version PLC incinerator is newest design for waste treatment, include medical waste, animal cremation and other solid waste. This equipment quality structural for types of site, like hospital, environmental department, animal cremation agencies, etc.. CLOVER petrol incinerator, diesel incinerator 50 kg/hr, diesel livestock cremator, […]
1.A chamber of post combustion of gases A burner of combustion of gases, A device of injection of air allowing a total re-combustion of gases, A device of air inlet of cooling of waste gases, A sheath of evacuation of the gases burnt, Carcass in strong sheet steel with support of connection Composition of the refractory; Refractory concrete: Thickness :>150mm Nature: 65%% of Al203 Insulate in fibrous panels: Thickness: >85mm Nature: Calcium Burner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve. A secondary injection of air to ensure perfect oxygen content. 2.A control box ensuring the complete cycle of combustion. 3.Fan: Electro-ventilator distributing the secondary air, the regulation of the air flow being carried out by valves and following the control of the automatic cycle. 4.Controls and regulations: Control box watertight to dust, including: A switch circuit breaker for each engine (ventilators and burners). A timer with adjustable temporization for the regulation of each burner. A regulator with digital watching for the temperature of combustion. A regulator with digital watching for the temperature of post-combustion. Electric box. 5.The de-ashing must be done in the bottom of the combustion chamber or the de-ashing should be automatic or manual batch de-ashing. 6.Process filtering system: scrubber to be mentioned as optional 7.Emission standards compliance: BS 3316 or equivalent standard 8.Capacity to treat plastic: not less than 40% by weight 9.CE manufacturing compliance: BS EN 746-2-1997