Day: July 29, 2021

ADJUMANI. El incinerador del Hospital Adjumani, que se construyó hace cuatro años, explotó debido al sobrecalentamiento. Durante los últimos cuatro meses, el personal de apoyo del hospital ha estado arrojando desechos médicos dentro del recinto del incinerador en lugar de quemarlos. El administrador del hospital, Michael Ojja, dijo a Daily Monitor el miércoles que el […]
waste incinerator 每天更新 ⋅ 2021年7月29日 新闻 Activists call for denial of Cohoes waste incinerator's new permit WNYT COHOES – Area activists are once again turning up the heat on a local waste incinerator. Norlite in Cohoes came under fire for burning PFAS found in … 标记为不相关 For clues about future PFAS regulations, landfill operators look to […]
sur le brûleur de l’incinérateur, il y a une pompe à huile et deux tubes pour la conduite d’aspiration et la conduite de retour.
2019-05-18 기업 뉴스209 조회수 이번에 고객이 쇼핑을 한 후 입찰 및 협상 프로세스가 끝난 후에도 고객은 여전히 우리가 한국 회사와 자동 롤링 필터 를 일치시키는 데 풍부한 경험이 있고 제품이 비용 효율적이라고 생각하여 마침내 서명하기로 결정했습니다. 우리. 서명 된 자동 롤러 블라인드 1 차 필터는 3 가지 유형의 에어컨 장치에 사용되며 중앙 제어 모드를 사용하여 […]
There are generally 4 different kinds of medical waste: infectious, hazardous, radioactive, and general.For the purposes of this review these sources are defined as giving rise to four major categories of waste: municipal solid waste, industrial waste, agricultural waste and hazardous waste. What Colour bags are used for clinical waste? Clinical waste. Correct segregation. Colour […]
There are generally 4 different kinds of medical waste: infectious, hazardous, radioactive, and general.For the purposes of this review these sources are defined as giving rise to four major categories of waste: municipal solid waste, industrial waste, agricultural waste and hazardous waste. What Colour bags are used for clinical waste? Clinical waste. Correct segregation. Colour […]
biohazard waste disposal guidelines 1. The ground should be flat when install the incinerator. There should be 100cm at least between the incinerator  and the walls on the two sides and the back, which is in convenient maintenance and repair. 2.  A), Place the incinerator main body(combustion chamber) and fixed with bolts and Asbestos tape. B), Place the wet scrubber system and fixed with bolts and Asbestos tape. C). Install chimneys and fixed with bolts, Asbestos tape and Steel Rope. D). Fix the incineration house roof. E). Fix burner, blower, wind tube, electric system, fuel system. 3. Check the electric wire: the incinerator’s electric circuit should be linked with the ground wire to guard against current leakage.  The link-up of the electric wire should be checked carefully before starting the incinerator, in case of wrong link-up or leakage. 4. Check of the fuel supply system: Except the Burner’s soft pipe which is used for the fuel flowing-in and flowing-back, all the rest pipes must use brass or steel pipe. No leakage is allowed at pipe junctions. Any leakage should be blocked in time. 5. Install steel rope with the chimney, to avoid tilt by wind.  6. Install net cover at the blower, to avoid sundries. 7. If the fuel is Natural Gas with gas burner, please contact with local administration section and install gas supplier system. 8. Crane or forklift is necessary when download/upload/install incinerator.  9. Topped work house roof after installation. 10.Get the video material: http://www.eclover.net/category/incinerator-video/     Nanjing Clover Medical Technology Co.,Ltd. incinerate china orders incinerators hospital waste disposal ppt safe waste incinerator company medical sharps disposal services in kenya Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) Burn Rate (Average) 10-20 kg/hour 20-30 kg/hour 30-50 kg/hour 50-100 kg/hour Control Mode PLC Auto. PLC Auto. PLC Auto. PLC Auto. […]
biohazard waste disposal guidelines 1. The ground should be flat when install the incinerator. There should be 100cm at least between the incinerator  and the walls on the two sides and the back, which is in convenient maintenance and repair. 2.  A), Place the incinerator main body(combustion chamber) and fixed with bolts and Asbestos tape. B), Place the wet scrubber system and fixed with bolts and Asbestos tape. C). Install chimneys and fixed with bolts, Asbestos tape and Steel Rope. D). Fix the incineration house roof. E). Fix burner, blower, wind tube, electric system, fuel system. 3. Check the electric wire: the incinerator’s electric circuit should be linked with the ground wire to guard against current leakage.  The link-up of the electric wire should be checked carefully before starting the incinerator, in case of wrong link-up or leakage. 4. Check of the fuel supply system: Except the Burner’s soft pipe which is used for the fuel flowing-in and flowing-back, all the rest pipes must use brass or steel pipe. No leakage is allowed at pipe junctions. Any leakage should be blocked in time. 5. Install steel rope with the chimney, to avoid tilt by wind.  6. Install net cover at the blower, to avoid sundries. 7. If the fuel is Natural Gas with gas burner, please contact with local administration section and install gas supplier system. 8. Crane or forklift is necessary when download/upload/install incinerator.  9. Topped work house roof after installation. 10.Get the video material: http://www.eclover.net/category/incinerator-video/     Nanjing Clover Medical Technology Co.,Ltd. incinerate china orders incinerators hospital waste disposal ppt safe waste incinerator company medical sharps disposal services in kenya Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) Burn Rate (Average) 10-20 kg/hour 20-30 kg/hour 30-50 kg/hour 50-100 kg/hour Control Mode PLC Auto. PLC Auto. PLC Auto. PLC Auto. […]
diesel powered incinerator means the burner type is light oil with diesel oil fuel. the incinerator made by us have 2 combustion chamber, the primary with 1-2 burners, and the secondary chamber with 1 burner.   all incinerator fixed with PLC Auto control system.       Nanjing Clover Medical Technology Co.,Ltd. Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) […]