El panel comprenderá un compartimento para la conexión de cables de potencia y control. Pasaje para cables de alimentación y Los cables de control estarán hechos por la parte inferior del cuadro de distribución. El cajón se bloqueará en la posición de aislamiento mediante candados. Se requiere la instalación de dos sistemas en el sur […]
Capacity Not less than 500Kg/hr. Operation 24hr-7days/week continuous operation. Combustion chamber 2 combustion chamber. Temp. First combustion chamber 800-1000 C. Secandry combustion chamber 1000-1200 C, with the possibility to be upgraded to 1400 C. Combustion Efficiency 99.99% Retention time Of the flow gases not less than 2 Sec in the hot portion. Excess Oxygen concentration Of primary combustion chamber 3-6% max. Refractory The chambers should be lined with high thermal insulating refractory bricks with suitable thickness and with highly temp. resistance. Not less than 1400 C for the first combustion chamber, and not less than 1600 C for the secandry combustion chamber, and at the same time prevent the Temp. of the outside body of the chamber not higher than 70 C. Doors Should be lined with the same bricks, and the edges lined with special suitable insulating material to prevent any gas escaping, and the doors should be kept under negative pressure during the operation. Air Emission Control System With high destruction and removal efficiency (DRE). Not less than 99.9999 as per KEPA. Wet System If the system equiped with a CEMS washing the flow gas with water, then it should be manufactured from suitable anti corrossion materials, and equiped with pH meter to measure and neutralize the water. It should be able to use the water in closed recycled circuit many times before treating/ discharging into the sewage system in compliance with KEPARS. Chemical dosing It should be equiped with suitable autochemical dosing system to control the pH for the water of the wet scrubber system including sensors. Chimney It should be suitable with the capacity and the technical specifications, with height not less than 12m from ground level. With easy opennable sampling point equal about 3 inch, and the optimum sampling locations is at least 8D downstream direction and 2D upstream from any flow disturbancies. Sampling point Should be equiped with a platform located down the sampling point by a distance not less than 1 m, and equiped with suitable stairs from ground to the port with comfortable slope. Ash Removal It should be auto ash removal system. Fuel It should be dual system, such as diesel and natural gas. Feeding System Should be auto feeding system into primary chamber. Control Room Should be equiped with a control panel shows Temp. of the combustion burners, gas monitoring, digital Temp. indecation for the primary/secondary chambers, digital Temp. indication for the gases…etc. it should be also Auto operation, burnures on/off auto lamps switch, auto start/stop for air emission control system, auto gas continuous monitoring system reading and print out of gas emission parameters…etc. Cooling System The primary chamber should be provided with auto cooling systemthrough nozzles to permit direct cooling if the Temp. will be heigher than 1100 C. Inter-lock system The incinerator should be equiped with inter-lock system to prevent feeding the waste to the primary chamber if the combustion Temp. less than 500 C. Flue treatment and cleaning […]
incinerator 实时更新 ⋅ 2021年8月14日 新闻 West Norfolk councillors say no to bid for Wisbech incinerator Lynn News Mr de Whalley said that a solid waste incinerator, which would come online in around seven years, is incompatible with the UK waste strategy, and … 标记为不相关 Concerns over plans for medical waste incinerator in Hunts village Hunts Post […]
waste incinerator 每天更新 ⋅ 2021年8月14日 新闻 Environment Agency apologises for Portland waste incinerator error Dorset Echo THE deadline to respond to the Portland waste incinerator consultation has been extended after an error meant that a report on air quality was not … 标记为不相关 Portland waste incinerator criticised by Weymouth Town Council in consultation debate Dorset Echo […]
Patients for this debilitating virus create 440 gallons of medical waste daily, such as instruments, gowns, gloves, body fluids, linens, sheets and more. That is a considerable amount of medical waste in any circumstance, but it is particularly daunting in this situation because it ought to be disposed extremely carefully, to avoid the chance of […]
Informations de base. Sources de pullution: traitement des déchets solides Méthodes de traitement: traitement combiné de l’eau Marchés d’exportation: mondiaux Information additionnelle. Marque Déposée: Clover Description du produit Nanjing Clover Medical Technology Co., Ltd. est l’un des principaux fabricants d’incinérateurs de déchets en Chine. Nous sommes un fabricant local et l’un des plus grands exportateurs […]
Phone: +86-13813931455(whatsapp/wechat)Website: http://www.hiclover.com/ Email: [email protected]Email: [email protected] Nanjing Clover Medical Technology Co.,Ltd. HICLOVER Incinerator/Parts Range Main Feature Medical Waste Incinerators HICLOVER 10-500kgs/Hr.Double Combustion Chambers Single Combustion Chamber Small, Cheap,10-20kgs/Hr. Three Combustion Chambers(Optional) 3 Ranked for high risk waste Pet Cremation Equipment For Pet(small/big) Cremation Business Animal Incineration Equipment For additional creature incineration Items/Model TS100(PLC) TS150(PLC) TS300(PLC) TS500(PLC) Burn Rate (Typical ) 100 kg/hour 150 kg/hour 300 […]
2019 년 5 월 16 일 Industry News 206 조회 1 차 필터를 설치하는 것이 전체 에어컨 팬 또는 공기 역학 장비에서 결정적인 역할을한다는 것은 누구나 알고 있습니다. 기본 필터는 다음 요구 사항을 충족 할 수 있습니다. 1, 먼지 등과 같은 실내 공기 오염을 효과적으로 처리하여 깨끗한 공기를 제공하십시오 . 2, 에어컨의 공기 […]
2019-05-20 Hiệu suất và trường hợp219 lượt xem DuPont Solar Tên dự án: Phòng tắm không khí trong phòng sạch bằng năng lượng mặt trời DuPont Thâm Quyến Giới thiệu dự án: Thiết kế và lắp đặt phòng tắm không khí tại nhà máy mới Thời gian đảm nhận: 2009,9 DuPont, được thành lập vào […]