Day: November 1, 2021

We are in the process of building a new hospital waste treatment plant and we are evaluating different technologies from around the world.  We are looking to incinerate approx. 1 to 2 tons of biomedical waste per day using LPG for heating.  Please send me all general information and quotes for machines of all ranges that could meet our needs.  Also, please include emissions reports of all of the various machines that could be of interest to us especially with regards to  dioxins and furals as well as lists of recommendations from past clients.  If you have any government entities using your machines please include lists of whom they are as well as any documentation that you contain that can prove their use.  Timing is also very important to us with regards of when the machines can arrive to Peru and be up and running. Therefore, it would be appreciated if you could include time frames and the whole process from purchase to installation and maintenance.  Burning Rate:5–120kg/hour Minimum Operating Temperature:850o C(primary combustion) Maximum Operating Temperature:1450 oC(Afterburner chamber) Secondary Burning Capacity:Compulsory Density Insulation:20mm High Refractory Casting:Minimum 65mm Heavy duty refracting lining to withstand:1500 oC Average burn out time :maximum:3 hrs Fuel type:Diesel Fuel Consumption in L/hr:7.5 to 9 Residence time in secondary chamber:2sec Residue ash pot 100kg:Max 3.8kg
Product Description Nanjing Clover Medical Technology Co., Ltd. Is a leading waste incinerator manufacturer in China. We are local manufacturer and one of the largest exporter of China. Pyrolytic incinerator equipment technical is main waste treatment all of the world, for Medical Waste, Animal Incineration, incinerator portable, incinerator price china, incinerator primary chamber material, incinerator […]
2019-05-20 Kết quả và Trường hợp336 lượt xem Nhà sản xuất rơ le chuyên nghiệp-Tianrui Precision Electronics Co., Ltd. Phòng tắm bằng thép không gỉ, phòng tắm đôi đôi, phòng tắm đôi đơn Giới thiệu dự án: Vòi sen bằng thép không gỉ được sử dụng ở lối vào của phân xưởng sản xuất rơ […]
Medical Waste Incinerator, 50 to 60 Kg/hr Support Health Sector Support Project Point of Installation (Hospitals) Moi Voi, Makindu, Maragua, Eldama Ravine and Isiolo District Hospitals 1.    General Description Supply, delivery, installation and commissioning of a medical waste incinerator suitable for disposal of Medical, General and Pathological waste in a safe and clean environment.  The unit shall consist of two chambers and operate on the principal of controlled air and temperature. The unit shall consist a particulate remover (scrubbers) as stipulated in waste management regulations, 2006 (Legal notice NO. 121 of 29th September, 2006).  The Unit shall be fully automatic and controlled by an automatic electronic controlled system except loading system which shall be manual.  The unit shall be capable of incinerating between 50 to 60 kg of solid medical waste per hour.  It shall be constructed from mild or aluminized steel lined with refractory material. Main unit Application For incineration, general and pathological Capacity   50 C 60 kg/h burn rate Type Two  combustion chambers type; primary  and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unit Operating time                Minimum 8 hours daily Operating temperature     From 850 0C to 1200 0C, Automatic controlled Residual Ash                    5 to 10%     3.2     Primary Chamber Construction Constructed from heavy duty mild or aluminized  steel Or equal and approved equivalent Insulation material            Refractory material lining similar or equal to calcium  Silicate and hot face combination of heavy duty brickwork Internal Construction        Fixed hearth type complete with gratings, concave bottom and charging door, lined with refractory material Charging Door                   Suitable for manual loading of wastes and with smooth  Dear seal equivalent of Ceramic seals with hinges. Door Lock                          Automatic, Electric type Ash removal door    Provided, for removing resultant bottom ash leftovers                              from the Primary chamber Gratings   Provided Loading Manual loading of waste Primary Burner                        Fully automatic, with fuel, temperature and speed controls with ignition system, flame detector, Air fan complete with safety features, flame failure,  Diesel fired fuel injector type and Flange mounted                                                                                                     Blower Provided. For supplying excess combustion air through the distribution system with speed control system Temperature Minimum exit 850 0C Observation port To be provided with protective glass type Construction   Constructed from heavy duty mild or aluminized steel or equal and approved equivalent Insulation Refractory material lining Combustion Temperatures        Above 850 0C, controlled electronically […]
NB.; Civil tasks in addition to any kind of various other pertinent options for the installation together with training of drivers require to be included in the heater’s rate. Needs for the shelter of the burner: Home of the incinerator comprehensive in offer (your residence have to have toilet in addition to hand cleaning facilities […]
Capacity Not less than 500Kg/hr.Operation 24hr-7days/week continuous operation.Combustion chamber 2 combustion chamber.Temp. First combustion chamber 800-1000 C. Secandry combustion chamber 1000-1200 C, with the possibility to be upgraded to 1400 C.Combustion Efficiency 99.99%Retention time Of the flow gases not less than 2 Sec in the hot portion.Excess Oxygen concentration Of primary combustion chamber 3-6% max. Refractory The chambers should be lined with high thermal insulating refractory bricks with suitable thickness and with highly temp. resistance. Not less than 1400 C for the first combustion chamber, and not less than 1600 C for the secandry combustion chamber, and at the same time prevent the Temp. of the outside body of the chamber not higher than 70 C.Doors Should be lined with the same bricks, and the edges lined with special suitable insulating material to prevent any gas escaping, and the doors should be kept under negative pressure during the operation.Air Emission Control System With high destruction and removal efficiency (DRE). Not less than 99.9999 as per KEPA.Wet System If the system equiped with a CEMS washing the flow gas with water, then it should be manufactured from suitable anti corrossion materials, and equiped with pH meter to measure and neutralize the water. It should be able to use the water in closed recycled circuit many times before treating/ discharging into the sewage system in compliance with KEPARS.Chemical dosing It should be equiped with suitable autochemical dosing system to control the pH for the water of the wet scrubber system including sensors.Chimney It should be suitable with the capacity and the technical specifications, with height not less than 12m from ground level. With easy opennable sampling point equal about 3 inch, and the optimum sampling locations is at least 8D downstream direction and 2D upstream from any flow disturbancies.Sampling point Should be equiped with a platform located down the sampling point by a distance not less than 1 m, and equiped with suitable stairs from ground to the port with comfortable slope.Ash Removal It should be auto ash removal system.Fuel It should be dual system, such as diesel and natural gas.Feeding System Should be auto feeding system into primary chamber.Control Room Should be equiped with a control panel shows Temp. of the combustion burners, gas monitoring, digital Temp. indecation for the primary/secondary chambers, digital Temp. indication for the gases…etc. it should be also Auto operation, burnures on/off auto lamps switch, auto start/stop for air emission control system, auto gas continuous monitoring system reading and print out of gas emission parameters…etc.Cooling System The primary chamber should be provided with auto cooling systemthrough nozzles to permit direct cooling if the Temp. will be heigher than 1100 C.Inter-lock system The incinerator should be equiped with inter-lock system to prevent feeding the waste to the primary chamber if the combustion Temp. less than 500 C.Flue treatment and cleaning To consist a combined system (wet/dry), using water, lime, active carbon and ceramic filters.Quenching system/Heat exchanger Should be made and manufactured from anti corrosion and acid attack materials such as stainless steel 316 or equivalent.Noise Level Not more than 85 dBA during normal operation.Inaddition The desigh should insure that responsive fail-safe control systems are used. The incinerator should be installed inside closed suitable building with good aeration and ventilation system. The building has facilities for off-loading of wastes from transport vehicles. Auto cleaning system for trucks and waste containers, and cool storage area…etc. The quotation should included list of original spare parts for 7 years. The quotation should include supervising, starting up and training of the operators and ministry of health engineers inside/outside Kuwait. Detailed drawings, catalogs should be included.
Informations de base. Type: Incinérateur Marchés d’exportation: mondiaux Description du produit Principales caractéristiques: * Tous les modèles avec double chambre de combustion. * Cheminée / cheminée en acier inoxydable, longue durée de vie. * selon commande * Haute température, longue durée de vie de l’incinérateur. * Installation gratuite ou minimale sur site. * Taux de […]
2019年05月22日 行業動態 199 views 在許多車間內,為保證車間的潔凈度,所以一些車間會在車間的門口附近安裝一個空氣浴塵室或風淋室,以此來保證每個進入到車間內的工人,都不會帶着灰塵進入的。可是在操作空氣浴塵室的過程中,又需要注意什麼問題?下面將跟大家做一下介紹:    進入口的門是不能同時來打開的,如有空氣給吹出來,還沒停止的時候,預防把浴塵室側邊的門給打開。當進入到浴塵室的時候,一定需要依照空氣浴塵室的最大容納人規定來進入的,出來的時候,會限制不能超過10個人的。    在空氣浴塵室當中,需要依據所規定的位置來站立的,而空氣沐浴的時候,還需要來轉動自己的身體、拍打身上的無沉服,才便於灰塵更好的被吹凈。雙腳是需要多次來踩踏腳踏黏墊的,對清除鞋底的灰塵、異物也都是非常有利的。每個工人在進入車間來工作的時候,都需要在空氣浴塵室中來清潔身上的灰塵,免得把外界的灰塵帶入到車間中,污染到車間內的環境,不利於在車間內,更好來工作。    工人在進入車間之前,這無塵服是不能夠接觸牆壁、地板等一些地方的。更不可以來觸動出風口的,在安裝時,是需要定期來做出確認,並且還需要來記錄出風口的位置是不是正確的。而迴風口的過濾網,最好的更換頻率要控制在1季/次。一旦有破損或臟污的時候,是需要馬上來更換掉的。同時,更換的時候,還需要通知廠務來處理,也要記錄浴塵室的點檢表當中。   看來,在操作空氣浴塵室時,這個操作過程也確實有不少地方是需要注意的,如沒有很好來注意的話,那就有可能會在使用過程中,出現一些問題的。對浴塵室的正  確使用,會帶來很不利的影響的。 上一篇: 風管型自動捲簾式過濾器的安裝與維護 下一篇: 自動感應門風淋室的價格趨勢 更多內容 網址: www.ecolead.cn 電話: 025-57138032 捲簾式空氣過濾器與板式初效過濾器孰優孰劣,功能優缺點分析解剖 風淋室報價,新風捲簾過濾器在實際生產中的應用,不鏽鋼風淋房,凈化潔凈棚,捲軸式新風過濾器,電器,1雙人雙吹風淋室潔凈室凈化彩鋼安裝,風淋室製造商,針式過濾器,脫碳過濾器,袋式, 卷繞式空氣過濾器與板式初效過濾器孰優孰劣,投入及運行成本分析解剖 卷鯰門過濾器,潔凈篷,標準型自動卷繞式過濾器,新風捲簾過濾器在實際生產中的應用,自動捲簾式廠家,凈化車間風淋室,rto,過濾室,捲簾式過濾器,電器,電動卷繞式過濾器潔凈室及凈化工程, 潔凈棚結構介紹 凈化風淋室,1雙人雙吹風淋室,直板型卷繞式過濾器,潔凈棚ffu控制器,潔凈工作棚,天津捲簾過濾器,潔凈棚,捲簾式過濾器適用場合 卷繞式空氣過濾器在水處理行業的應用解析 風機過濾器,自動捲簾式廠家,南京捲簾式過濾器,捲軸式新風過濾器,卷撓式過濾器,捲簾空氣過濾器價格,卷繞空氣過濾器,捲簾式過濾器適用場合,自動捲簾過濾器價格,潔凈室潔凈棚 潔凈棚的作用 快速捲簾門廠,捲簾過濾器濾棉,凈化無塵車間,卷繞式初效過濾器,用途,風淋室哪家好江蘇,自動捲軸式過濾器,自動捲簾式過濾器價格,轉輪式全熱交換器帶自卷過濾器, 自動捲簾式空氣過濾器調試注意事項 卷繞式空氣過濾器廠家,南京潔凈棚,風淋室,自動捲簾式 南京伊希歐風淋室專業廠家簡要介紹 卷繞式空氣過濾器廠家,南京潔凈棚,風淋室,自動捲簾式 潔凈室潔凈度的相關概念以及相關標準 卷繞式空氣過濾器廠家,南京潔凈棚,風淋室,自動捲簾式 自動捲簾過濾器產品結構簡介 卷繞式空氣過濾器廠家,南京潔凈棚,風淋室,自動捲簾式 卷繞式空氣過濾器採用專用卷繞式過濾材料 卷繞式空氣過濾器廠家,南京潔凈棚,風淋室,自動捲簾式 什麼是立式自動卷繞式過濾器? 卷繞式空氣過濾器廠家,南京潔凈棚,風淋室,自動捲簾式 為什麼需要用卷繞式過濾器? 卷繞式空氣過濾器廠家,南京潔凈棚,風淋室,自動捲簾式 潔凈棚與無塵車間之間,如何做選擇? 卷繞式空氣過濾器廠家,南京潔凈棚,風淋室,自動捲簾式 風淋室市場價格差距原因解析之一:風淋室材質及表面處理工藝分析 卷繞式空氣過濾器廠家,南京潔凈棚,風淋室,自動捲簾式 自動卷繞式過濾器的濾料多長時間更換? 卷繞式空氣過濾器廠家,南京潔凈棚,風淋室,自動捲簾式 卧式和立式自動捲簾式過濾器的區別 卷繞式空氣過濾器廠家,南京潔凈棚,風淋室,自動捲簾式 […]
وصف المنتج نانجينغ البرسيم التكنولوجيا الطبية المحدودة ، المحلية في مدينة نانجينغ ، الصين. CLOVER هي الشركة المصنعة للمنتجات الطبية ، ومحرقة النفايات وغيرها من الموقد الغازي البيئي ، ومحرقة حرق الغاز ، وحيوانات غرفة الغاز ، وغرفة احتراق الغاز ، ومحرقة الحديقة التي تعمل بالغاز ، ومعدات الحماية. شبكة السوق عبر أراضي الصين وأكثر […]
2019-05-19 Pencapaian dan kes 241 pandangan LG Chem, LG Tongchuang Aliran udara yang bersih, kecekapan tinggi, BFU Nama projek: Nanjing LG Chem, gudang bersih Tongchuang LG, BFU, saluran udara kecekapan tinggi Pengenalan projek: Reka bentuk, pengeluaran dan pemasangan gudang bersih di kawasan kilang LG Chem, pengeluaran peralatan pemurnian oleh LG Tongchuang Menjalankan masa: 2015.9-2016.3 LG […]