Flue Gas Cleaning   System   ? Wet Scrubber   ? Electrostatic precipitation in combination ( Optional: Rate to be   quoted separately)     7 Chimney Height 10m (minimum)       ?     Total duration of the supervision of installation, testing and commissioning works shall not exceed 2 weeks.     2.11       Commissioning   […]
Items/Model TS500(PLC) Picture Principle Waste Incineration Treatment Burn Rate 150-200 kg/hour Control Mode PLC(Programmable Logic Controller Incinerator) Combustion Chamber 2700L Internal Dimensions 190x120x120cm Secondary Chamber 1300L Smoke Filter Chamber Yes Feed Mode Manual Voltage 220V Oil Consumption (kg/hour) Average 28 Gas Consumption (m3/hour) *** Temperature Monitor Digital Display Temperature Protection Yes Oil Tank 1400L Feed […]