Day: September 2, 2024

An operating test should be conducted to ensure that all of the control components have been properly installed and that all parts of the incinerator, including controls and safety devices, are in satisfactory operating condition. The requirements for prepurge and time between restarts should be verified. The test should include but not limited to the […]
Items/Model TS300(PLC) Principle Waste Incineration Treatment Burn Rate Average 250 kg/hour Control Mode PLC(Programmable Logic Controller Incinerator) Combustion Chamber 2000L Internal Dimensions 170x120x100cm Secondary Chamber 1000L Smoke Filter Chamber Yes Feed Mode Manual Voltage 220V Power 2.5Kw Oil Consumption (kg/hour) Average 28(DO) Gas Consumption (m3/hour) *** Temperature Monitor Digital Display Temperature Protection Yes Oil Tank […]
1) Источник питания: (а) Поставка ключей: (i) Подача в одиночной фазе; 220–240 В, 50 Гц (ii) трехступенчатая поставка; 380–415 В, 50 Гц (iii) Электрическая розетка (розетки) источника питания для однофазной системы электроснабжения в больнице имеет три контакта и также соответствует стандарту BS1363. (b) Изменение: (i) Смена сети – обычная проблема, эта проблема должна влиять на […]