Blog

Terminar Todo el equipo se debe pintar con una capa de imprimación rica en zinc y dos capas de pintura resistente al calor para altas temperaturas. Pintura tipo poliuretano. Todas las superficies pintadas se prepararán mediante limpieza con granalla de acero o con chorro de arena. Placas de identificación y nombre Placas de identificación y […]
An operating test should be conducted to ensure that all of the control components have been properly installed and that all parts of the incinerator, including controls and safety devices, are in satisfactory operating condition. The requirements for prepurge and time between restarts should be verified. The test should include but not limited to the […]
Items/Model TS300(PLC) Principle Waste Incineration Treatment Burn Rate Average 250 kg/hour Control Mode PLC(Programmable Logic Controller Incinerator) Combustion Chamber 2000L Internal Dimensions 170x120x100cm Secondary Chamber 1000L Smoke Filter Chamber Yes Feed Mode Manual Voltage 220V Power 2.5Kw Oil Consumption (kg/hour) Average 28(DO) Gas Consumption (m3/hour) *** Temperature Monitor Digital Display Temperature Protection Yes Oil Tank […]
1) Источник питания: (а) Поставка ключей: (i) Подача в одиночной фазе; 220–240 В, 50 Гц (ii) трехступенчатая поставка; 380–415 В, 50 Гц (iii) Электрическая розетка (розетки) источника питания для однофазной системы электроснабжения в больнице имеет три контакта и также соответствует стандарту BS1363. (b) Изменение: (i) Смена сети – обычная проблема, эта проблема должна влиять на […]
Model YD-100 Picture Burning Rate 100-150 kgs/hour Primary Combustion Chamber 2000 Liters Secondary Combustion Chamber 500 Liters Feed Mode Manual Voltage 220V/380V Power 2.5Kw Fuel Type Diesel Oil Burner Italy Original Oil Consumption (Diesel Oil) Average 28 kg/hour Gas Consumption (Natural Gas) *** Internal Dimensions 180x115x98 cm (primary chamber) External Dimensions 270x185x280cm (without chimney) Temperature […]
The successful bidder shall deliver the incinerator skid in a container. The container will be emptied by CEB and returned to the successful bidder / or to its shipping agent. A containerized solution is also acceptable. Electrically operated 220 volt ( 60 Cycle – 1 phaze ) Able to complete burning material that turns to […]
calentador diesel para desechos médicos Costo de combustión: 47,5–– – – 50 kg / hora. Nivel de temperatura mínima de funcionamiento: 850 o C (tecla de combustión). Nivel óptimo de temperatura de funcionamiento: 1450 oC (cámara de postcombustión). Segunda capacidad de combustión: Obligatoria. Espesor Aislamiento: 20 mm de alto. Fundición refractaria: Mínimo 65 mm. Revestimiento […]
Инсинератор, но размер камеры>> 2000 x >> 1200 мм. План сжигания жидких отходов +/- 20 л / час. Поддерживается Heavy OIL Burner. Установка для сжигания отходов, способная работать как с влажным, так и с полностью сухим мусором. Сюда входят бытовые отходы, а также сухие опавшие листья. Камера инсинератора должна быть способна вместить около 200-250 кг […]
Incinerator for hospital waste management with the following features: • In high temperatures (pyrolytic incinerator two chambers with temperatures ranging from 950 º C to 1320 º C; • Ability to destruction of 400 to 600kg per hour; • Capable of destroying microorganisms; • Drain ash; • Drain needle and glass crusher; • Porch with […]