Capacity Not less than 500Kg/hr. Operation 24hr-7days/week continuous operation. Combustion chamber 2 combustion chamber. Temp. First combustion chamber 800-1000 C. Secandry combustion chamber 1000-1200 C, with the possibility to be upgraded to 1400 C. Combustion Efficiency 99.99% Retention time Of the flow gases not less than 2 Sec in the hot portion. Excess Oxygen concentration Of primary combustion chamber 3-6% max. Refractory The chambers should be lined with high thermal insulating refractory bricks with suitable thickness and with highly temp. resistance. Not less than 1400 C for the first combustion chamber, and not less than 1600 C for the secandry combustion chamber, and at the same time prevent the Temp. of the outside body of the chamber not higher than 70 C. Doors Should be lined with the same bricks, and the edges lined with special suitable insulating material to prevent any gas escaping, and the doors should be kept under negative pressure during the operation. Air Emission Control System With high destruction and removal efficiency (DRE). Not less than 99.9999 as per KEPA. Wet System If the system equiped with a CEMS washing the flow gas with water, then it should be manufactured from suitable anti corrossion materials, and equiped with pH meter to measure and neutralize the water. It should be able to use the water in closed recycled circuit many times before treating/ discharging into the sewage system in compliance with KEPARS. Chemical dosing It should be equiped with suitable autochemical dosing system to control the pH for the water of the wet scrubber system including sensors. Chimney It should be suitable with the capacity and the technical specifications, with height not less than 12m from ground level. With easy opennable sampling point equal about 3 inch, and the optimum sampling locations is at least 8D downstream direction and 2D upstream from any flow disturbancies. Sampling point Should be equiped with a platform located down the sampling point by a distance not less than 1 m, and equiped with suitable stairs from ground to the port with comfortable slope. Ash Removal It should be auto ash removal system. Fuel It should be dual system, such as diesel and natural gas. Feeding System Should be auto feeding system into primary chamber. Control Room Should be equiped with a control panel shows Temp. of the combustion burners, gas monitoring, digital Temp. indecation for the primary/secondary chambers, digital Temp. indication for the gases…etc. it should be also Auto operation, burnures on/off auto lamps switch, auto start/stop for air emission control system, auto gas continuous monitoring system reading and print out of gas emission parameters…etc. Cooling System The primary chamber should be provided with auto cooling systemthrough nozzles to permit direct cooling if the Temp. will be heigher than 1100 C. Inter-lock system The incinerator should be equiped with inter-lock system to prevent feeding the waste to the primary chamber if the combustion Temp. less than 500 C. Flue treatment and cleaning […]
Capacity Not less than 500Kg/hr. Operation 24hr-7days/week continuous operation. Combustion chamber 2 combustion chamber. Temp. First combustion chamber 800-1000 C. Secandry combustion chamber 1000-1200 C, with the possibility to be upgraded to 1400 C. Combustion Efficiency 99.99% Retention time Of the flow gases not less than 2 Sec in the hot portion. Excess Oxygen concentration Of primary combustion chamber 3-6% max. Refractory The chambers should be lined with high thermal insulating refractory bricks with suitable thickness and with highly temp. resistance. Not less than 1400 C for the first combustion chamber, and not less than 1600 C for the secandry combustion chamber, and at the same time prevent the Temp. of the outside body of the chamber not higher than 70 C. Doors Should be lined with the same bricks, and the edges lined with special suitable insulating material to prevent any gas escaping, and the doors should be kept under negative pressure during the operation. Air Emission Control System With high destruction and removal efficiency (DRE). Not less than 99.9999 as per KEPA. Wet System If the system equiped with a CEMS washing the flow gas with water, then it should be manufactured from suitable anti corrossion materials, and equiped with pH meter to measure and neutralize the water. It should be able to use the water in closed recycled circuit many times before treating/ discharging into the sewage system in compliance with KEPARS. Chemical dosing It should be equiped with suitable autochemical dosing system to control the pH for the water of the wet scrubber system including sensors. Chimney It should be suitable with the capacity and the technical specifications, with height not less than 12m from ground level. With easy opennable sampling point equal about 3 inch, and the optimum sampling locations is at least 8D downstream direction and 2D upstream from any flow disturbancies. Sampling point Should be equiped with a platform located down the sampling point by a distance not less than 1 m, and equiped with suitable stairs from ground to the port with comfortable slope. Ash Removal It should be auto ash removal system. Fuel It should be dual system, such as diesel and natural gas. Feeding System Should be auto feeding system into primary chamber. Control Room Should be equiped with a control panel shows Temp. of the combustion burners, gas monitoring, digital Temp. indecation for the primary/secondary chambers, digital Temp. indication for the gases…etc. it should be also Auto operation, burnures on/off auto lamps switch, auto start/stop for air emission control system, auto gas continuous monitoring system reading and print out of gas emission parameters…etc. Cooling System The primary chamber should be provided with auto cooling systemthrough nozzles to permit direct cooling if the Temp. will be heigher than 1100 C. Inter-lock system The incinerator should be equiped with inter-lock system to prevent feeding the waste to the primary chamber if the combustion Temp. less than 500 C. Flue treatment and cleaning […]
“They save on having to bury the waste and we save on the consumption of natural gas,” he explained. READ MORE: Denmark pays for electricity Environmental protection agency Miljøstyrelsen explained that last year up to 200,000 tonnes of non-hazardous waste from England was incinerated in Denmark — almost six percentage of the total volume of […]
Principle of the hospital incinerator equipment is incineration/combustion/burn. Generally, the function is waste treatment for Solid waste, Liquid waste, Gas waste, etc.The main body is one combustion chamber (at least), Refractory line or firebrick, Insulation materials and the outer plate. Ignition element is external oil or gas burner. The burner can be running until waste […]
medical incinerators are for pathological waste (red bag waste), Biohazards & Sharps, General Medical Waste, from Hospitals, Research Center, Pharmaceutical Companies , Drug Manufactures, Primary Care Trusts, Cosmetic Surgery Clinics, Nursing Homes, Care Homes and other Clinical Waste. Average 20%-25% of the total waste generated by healthcare establishments is regarded as hazardous and may create […]
the china incinerator is not mean low price, low quality now. hiclover design different model incinerator, 2 or 3 combustion chamber, smoke filter with dry or wet scrubber, stainless steel chimney, mobile function incinerator, plc control incinerator, custom made service, etc Items/Model YD-30 YD-50 YD-100 YD-150 Burning Rate (kgs/Hour) 30 kgs/Hr. 50 kgs/Hr. 100 kgs/Hr. […]
we are medical incinerator manufacturer with years worth of experience in this sector, our medical range of incinerators are designed to cater for the economical needs of small clinics to the more demanding and specialized requirements of large hospitals in their waste management processes. Items/Model YD-30 YD-50 YD-100 YD-150 Burning Rate (kgs/Hour) 30 kgs/Hr. 50 […]
medical incinerator china ensure efficient, clean and hassle-free disposal of medical waste is possible. The incineration of clinical waste including pathological waste (red bag waste), Biohazards & Sharps, General Medical Waste, from Hospitals, Research Center, Pharmaceutical Companies , Drug Manufactures, Primary Care Trusts, Cosmetic Surgery Clinics, Nursing Homes, Care Homes and other Clinical Waste. Items/Model […]