Tag: incinerator

ADJUMANI. The incinerator at Adjumani Hospital, which was built four years ago, has burst due to overheating. For the past four months, support staff at the hospital have been dumping medical waste within the enclosure of the incinerator instead of burning it. The hospital administrator, Mr Michael Ojja, told Daily Monitor on Wednesday that the […]
hot medical waste disposing machine, Operation Condition: 8-16 hr/ day Control: Built-in data recordingOperating temperature: Incinerator /Primary Combustion ChamberPrimary Chamber: 900 – 1200 0C Type: continuous loading, Top LoadingCapacity/Burn rate per hour: 250 -300 kg/hr Material:External- 3 layers Internal lining:  a fire proof material of pre-fired refractory bricks with Aluminium lining, resistant to corrosive waste or gas and to thermal shockSecondary Combustion Chamber:Type: horizontal/verticalTemperature:  1200- 1300 oCResidence time of gases : >2 secondsAsh Residue: <5% of original waste sizeAsh Handling System: Both Automatic and manual removal of Ash. Must ensure removal/treatment of hazardous remnants of ashFlue gas treatment   system : Capable of treating the flow of flue  gas as the incinerator is operating at its maximum capacityAuxiliary device: Water level gauge, pressure sensor, PH sensor..etc Auxiliary device: Fuel cut-off deviceWaste  feeding mechanism: Automatic pneumatic/hydraulic waste loading system or conveyor belt , capacity 650-800 L at a time                                                                                                                                      Chimney (Stack):Type: Vertical typeheight:>7 meter’Material: Fireproof cast, stainless steelOUTPUT: GAS- SMOKELESS,ODORLESS ASH -Max <5% of original waste sizeReduction of Pollutant gas SO2, HCL, HF and line particulateEmission standard:WHO/ EuropeanTest report for emission testing provided?Heat exchange mode: Automatic Accessories:  All standard accessories for incinerator, including but not limited to loading system, heat exchangers, pollution control system, ash removal system, including ladder and oil tanker (2500litre capacity).Operating Environment: The incinerator is capable to operate at the altitude of 2400mt above sea level. (according to the site conditions)Power Requirement:220 Vac single phase or 380 Vac three phase 4 wire system  50HZ   Installation Testing and Commissioning :   to be conducted by certified or qualified personnel.  Supplier shall provide the following documentation    User (Operating) manual in English. Service (Technical / Maintenance) manual in English. Certificate of calibration and inspection from factory. Fast moving spare parts: Supplier is able to provide fast moving spare parts with quantities as described in the price schedule or their equivalent. Training: Supplier is able to provide training on operation, management and maintenance of incinerators.   Warranty Comprehensive warranty for minimum 2 year. Maintenance Service during Warranty Period During warranty period supplier must ensure, corrective/breakdown maintenance whenever required. Supplier has a local agent or branch office in Ethiopia (please indicate the name and contact details of the agent) Supplier provides labor, lifting equipment and tools needed for the installation, testing and commissioning of the incinerator. The supplier will be responsible for the safety of its staff, workers and laborers during the installation, testing & commisssioning Able to provides all necessary information that would be used as an input for preparation of floor (platform) and room for the incinerator to be supplied such as the following; Lay outs (drawings) and  pictures of the incinerators to be installed  Length, width and height of incinerator, Area (length x width) for the floor (platform) and Length, width and height for roofing, for each type of incinerators to be installed Needs during the transport, installation, assembly, commissioning and operation of the equipment in terms of access points, available space to operate (inside and outside of the room), ways to get to the site where the equipment will be placed or any others. ; Technical Specifications (fuel consumption rate, weight, anchoring system, support points, etc.); Chimney specifications to be used for the roof design ( size, support needs, insulation); Considerations related to operation and Maintenance, for e.g., minimum available area to perform routine maintenance tasks and replacement of key parts that need to be changed more frequently; Any consideration/need of the incinerator while being operated that might impact the design of the room/shelter where it will be placed.Other important information to be considered that can influence or impact the designing and building processes of the infrastructure for the incinerators, for example area dimension for other accessary parts like fuel tanker storage, if applicable, etc…. Delivery time (DAP, Addis Ababa) in weeksName of manufacturer including website of the manufacturer &/ supplier & country of origin
The Bangor Borough Authority will not sell the former incinerator property. Not right now, at least. The board voted Thursday evening to support authority Chairman Donald Butz’s Oct. 2 letter to borough council President James Kresge that stated the authority need to not sell the incinerator and the surrounding home now identified collectively as the […]
Veolia is seeking to source non-recyclable commercial and industrial waste for its Newhaven Incinerator from areas neighbouring East Sussex and Brighton and Hove. It argues this will allow the incinerator to produce enough energy to power 25,000 homes continuously. But cllr Rod Main from Newhaven said this would lead to more trucks and pollution. Veolia […]
Capacity of destruction in weight: 60 Kg/h. It should be able to operate not less than 10 hours/day This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics, laboratories, institutes, etc… Design Specification : Types A, B, C, D, and E of medical waste  “PYROLYTIC” combustion, by controlling the gasification of […]
On Friday Attorney General Buddy Caldwell announced the State of Louisiana reached an agreement with Texas incinerator Veolia Environmental Services and Louisiana hazardous waste landfill Chemical Waste Management to ensure that incinerator ash associated with the recent Dallas Ebola virus occurrence will not be transported or disposed of in Louisiana, . On Oct. 13 the […]
Heathrow Airport has announced plans to move an incinerator away from Stanwell and create a 15 mile ‘green ring’ around the town. The airport said it altered its plans after residents raised concerns over its plans to relocate its incinerator to the Bedfont Road area. A Labour county councillor however has said it is like […]
Supply, Installation and Commissioning of DIESEL FIRED INCINERATORSMedical Waste Incinerator, 100 to 120 Kg/hrApplication   For incineration, general and pathologicalCapacity    100 C 120 kg/h burn rateType Two  combustion chambers type; primary  and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unitOperating time                Minimum 8 hours dailyOperating temperature     From 850 0C to 1200 0C, Automatic controlledResidual Ash                    5 to 10%Construction Constructed from heavy duty mild or aluminized  steelOr equal and approved equivalent Insulation material            Refractory material lining similar or equal to calcium Silicate and hot face combination of heavy duty brickworkInternal Construction        Fixed hearth type complete with gratings, concave bottom and charging door, lined with refractory materialCharging Door                   Suitable for manual loading of wastes and with smooth Dear seal equivalent of Ceramic seals with hinges.Door Lock                          Automatic, Electric typeAsh removal door    Provided, for removing resultant bottom ash leftovers                              from the Primary chamberGratings    ProvidedLoading Manual loading of wastePrimary Burner                        Fully automatic, with fuel, temperature and speed  controls with ignition system  flame detector                                                         Air fan Complete with safety features, flame failure                                                                    Diesel fired fuel injector type                                               Flange mountedBlower   Provided.  3 phase for supplying excess combustion air through the distribution system with speed control systemTemperature Minimum exit 850 0CObservation port To be provided with protective glass type     3.3    Secondary chamber
THREE options are on the table for disposing off Tinian solid waste: incineration, Fukuoka method or off-island disposal. The Marine Forces Pacific recently held an ad hoc committee meeting with the Bureau of Environmental and Coastal Quality, Environmental Protection Agency, Tinian Mayor’s Office, Department of Public Works and Administration representatives at the BECQ office on […]
Metro Vancouver is taking more heat over its plan to build a second garbage incinerator, with a new study commissioned by waste company Belkorp Environmental Services suggesting the move could cost up to $1.3 billion more than originally estimated. The analysis, conducted by ICF International on behalf of Belkorp, comes as Metro Vancouver attempts to […]