low-cost medical waste incinerator is good idea for small clinic, small hospital, etc.Incineration is the only method providing complete destruction and neutralization of the medical waste ideally at the source. For developing country and regions, we support cheap cost budget customer to purchase the small scale incinerator, with basic function, burning rate 10kgs to 50kgs […]
Heathrow Airport has announced plans to move an incinerator away from Stanwell and create a 15 mile ‘green ring’ around town. A Labour county councillor nevertheless has stated it is like moving pieces around a chess board. “But neighborhood resident Andrew McLuskey has done all of the hard work. “But in saying that, we’re still […]
SPECIFICATIONS OF THE JKUAT INCINERATOR It should be a three chambered incinerator The load capacity of 250 kg The housing for the incinerator should be able to withstand the temperatures and other operational requirements. The chimney should have a strong refractory lining of special type of cement to withstand temperatures more than 1200oc. It should have a strong base for the machine to keep it stable, firm and secure during its operational lifespan. The primary (combustion) and the secondary (scorching) chambers to be fitted with burners for effective combustion. In the third chamber, scrubbers and precipitators will need to be installed as pollution control equipment before emission of gases into the atmosphere. A system for continuous emission Monitoring and Environmental Monitoring. A mechanism with which to treat the waste water before discharge into the sewerage system. Temperature control and monitoring devices (probe thermometer) should be availed to ensure that the right temperatures are attained in the chambers during operation. Motor (fans) sufficient to induce enough air into the combustion chambers and direct the gases towards the flue 9 chimney). High power electricity and emergency generator connection for automated ignition purposes. The chimney should be tall enough and be at least one meter above the tallest building in the vicinity. The fuel tank (industrial diesel) to be constructed next to but out side the incinerator housing for security purposes and to prevent fire hazards. Capacity of 250. Other Requirements Training of all the personnel involved in health care waste (HCW) management. The Automatic Feeding system of the Incinerator Automatic waste loading mechanism with conveyor belts. These will lead the waste into the first primary chamber. An Automatic bottom ashes discharge system.
معلومات أساسية. نموذج رقم: الصانع من محرقة النفايات الخطرة الصين مصادر السحب: معالجة النفايات الصلبة طرق المعالجة: الاحتراق أسواق التصدير: عالمية وصف المنتج تحليلات السوق الدولية لمحرقة النفايات يعطيك. 10 يونيو 2012 تنزيل: تنسيق Word / تنسيق PDF الكلمة الرئيسية: محارق صغيرة محرقة نفايات طبية محرقة حرق جثث الحيوانات الأليفة الشركات المصنعة للمحرقة المحرقة عبارة […]
HICLOVER brand is holder of Nanjing Clover Medical Technology Co.,Ltd. we are incinerator manufacturer in china and we made waste incinerator for medical waste, pet cremation, animal incineration and other solid waste treatment. HICLOVER is famous incinerator manufacturer all over the world and our incinerators sale to many countries. Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC) […]
No. of burners: 2 Nos. (1 No. in Primary Chamber and 1No. in Secondary Chamber)Type: Monoblock fully automaticFuel: DieselFuel Oil Storage Tank:Shall provide suitable capacity of oil storage tank.Material of Construction: Mild steel.Facility for visual checking of fuel shall be there.It shall have diesel consumption monitoring system.It shall come with diesel oil level indicator, piping with valves & N.R. valve.Control Panel:Type: Manual & Automated PLC based control panel with printer & recording device.Material of Construction: CRCA sheetIt shall have digital temperature controller.Epoxy powder coated washable paint finish.It shall have audio-visual alarm system.Chimney of 30 meters Height:Material of Construction: Mild SteelIt shall be self-supporting type.Height shall be 30 meters from ground level.Paint The chimney is painted externally with two coats of heat resistant aluminum paintShall provide ladder till the top.It shall have 3mm thick rubber lining from inside for protection.It shall come with aviation lamp, lightening arrestor, stack, drain, inspection platform, samplingport.Consumption certificate:The bidder must submit diesel consumption for a daily operation of 6 hours.Turnkey:Prices offered shall be inclusive of all civil works, electrical requirements including cabling andswitches required for installation & commissioning of the equipment.Bidder shall submit detail drawings, design, and layout plan of civil works.The bidder shall submit the details of BOQ of civil and electrical works.Accessories, spares and consumablesAll standard accessories, consumables and parts required to operate the equipment, includingall standard tools and cleaning and lubrication materials, to be included in the offer. Biddersmust specify the quantity of every item included in their offer (including items not specifiedabove).Operating EnvironmentThe system offered shall be designed to store and to operate normally under the conditions ofthe purchaser’s country. The conditions include Power Supply, Climate, Temperature,Humidity, etc.Power supply: 220-240 VAC, 50Hz single phase/400 C 420 VAC, 50Hz three phase asappropriate fitted with appropriate plug. The power cable must be at least 3 meter in length.Standards and Safety RequirementsIt shall have approval of “Pollution Control Board” of purchaser’s country.All mandatory approvals required for the installation and operation of incinerator shall be doneby the bidder.Must submit ISO 9001 ANDCE or USFDA approved product certificate.User TrainingMust provide user training (including how to use and maintain the equipment).WarrantyComprehensive warranty for 2 years after acceptance.Maintenance Service during Warranty PeriodDuring the warranty period supplier must ensure preventive maintenance along withcorrective/breakdown maintenance whenever required.Installation and CommissioningThe bidder must arrange for the equipment to be installed and commissioned by certified orqualified personnel; any prerequisites for installation to be communicated to the purchaser inadvance, in detail.
incinerator china, call hiclover brand(www.hiclover.com). Nanjing Clover Medical Technology Co.,Ltd. is top incinerator supplier in china and supply single combustion chamber, double combustion chambers, three combustion chambers and multi-combustion chambers waste incinerators. Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC) Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour Feed Capacity 20kg 40kg 60kg […]
Mobile Incinerator Burn Rate 50kg/h minimumBurn Rate 50kg/h minimumWeight (kg), please indicate:Secondary ChamberGas Retention Time – 2 SecondsFuel – Diesel/LPG/LNG, please indicatePower Supply for Control Box – 220V-240V 50Hz single phaseMinimum operating temperature 850 °C, please indicateOne year Spare Parts Package for complete maintainabilityBurn Rate 100kg/h minimumWeight (kg), please indicate:Secondary Chamber Gas Retention Time – 2 SecondsFuel – Diesel/LPG/LNG, please indicatePower Supply for Control Box – 220V-240V 50Hz single phaseMinimum operating temperature 850 °C, please indicateBurn Rate 100kg/h minimumWeight (kg), please indicate:Secondary ChamberGas Retention Time – 2 SecondsFuel – Diesel/LPG/LNG, please indicatePower Supply for Control Box – 220V-240V 50Hz single phaseMinimum operating temperature 1200 °C, please indicateOne year Spare Parts Package for complete maintainability
وصف المنتج المحرقة عبارة عن معدات حرق ، نفايات حريق مباشر بواسطة وقود الغاز أو الوقود النفطي. كطوق مختلف ، يمكن تسمية المحرقة بالعديد من الكلمات على النحو التالي: قدرة المعالجة: محرقة صغيرة الحجم ، محرقة واسعة النطاق وبانت حرق. مواد النفايات: محرقة النفايات البلدية ، محرقة النفايات الطبية ، محرقة جثث الحيوانات ، محارق […]