1- There are more than 4000 Cubic Meter sludge are packed in Plastic Bags & stored more than 10 years 2- Cleaning and treated 2500 Cubic Meters inside the Oil Tank. – the waste is biological and coming from lab, can be heavily hazardous in case of terror attack or epidemics or similar events. – […]
Medical Waste treatment unit The medical waste treatment unit shall be environmentally-friendly, and have a capacity of about 200-300kg per batch , to enable treatment of medical waste generated in a 160-bed hospital The equipment should be self-steam generating if steam is needed for the sterilization process. The medical waste treatment unit shall be capable […]
The Contractor shall provide a Cremation System package for TWO (02) Cremators and system approved by related authority, which must fit into the allocated area as shown on the plan drawings. The work shall include but not limited to design preparation, authority design approval, supply, fabricate, construct, commissioning, testing, operational approval, provide training and also […]
Dual heat burners and dual chamber incinerator Burning capacity up to 30 Kg per hour Main Product List Primary Combustion Chamber(Main body stainless steel) Secondary Combustion Chamber(Main body stainless steel) Mix-Combustion Chamber Wet Scrubber( Washing Tower)(Main body stainless steel) Incinerator Control Case Chimney:5.0Meters Stainless Steel Italy gas burner: 02 sets Oil Tank (if oil fuel): […]
Model YD-30M Primary Combustion Chamber Secondary Combustion Chamber Mix Combustion Chamber Smoke Filter Chamber Incinerator Control Case Stainless Steel Chimney: 1.5 Meter Italy oil/gas burner: 02 sets Oil Tank (if oil fuel): 100Liters Video material: https://twitter.com/i/status/1279030799182905345 Model YD-30M Picture Burning Rate average 20 kgs/hour Feed Capacity average 40 kgs/feeding Paimary Combustion Chamber 200 Liters Secondary […]
The medical waste to be disposed from the incinerator is a mixture of plastics, paper, Sort 4 waste, etc., and is a widely changing character having a Btu content that might well exceed the reported price of 2,326,000 J/kg (1000 Btu percent ). Prior to developing final design of the incinerator, comprehensive waste category needs […]
The role of municipal governments is important in the proper local management of solid waste. Under the Nunavut Land Claims Agreement, municipalities are entitled to control their own municipal disposal sites. Local environmental and safety standards are determined, in part, by how the land is designated under municipal government development plans (i.e. land use zoning). […]
The generator of a waste is responsible for its safe management from cradle-to-grave. Using raw materials efficiently and reducing the amount of waste generated is the most important step in waste management planning. For example, through improved waste management planning, it may be possible to reduce or eliminate the need to burn or incinerate waste […]
[China] Solid Waste Environmental online waste incineration industries development momentum is fierce, and the brightest of capital chasing even appear several times in the last year the price of handling fee diving, industry raised concerns about the vicious competition. “Thirteen Five” during garbage construction market investment space at 1000 billion yuan; the growing garbage incineration […]
Double Combustion Chamber All waste incinerator design with double combustion chamber. High Temperature, Smoke Treatment,No black smoke, Environmentally friendly. Containerized Mobile Incinerator The incinerator mounted in ISO Container before leave factory, free-installation, no incineration house build construction,movable by truck. Family Pet Dog&Cat Cremation Special design with movable platform, combustion chamber material and custom made for […]