blaze mostly pharmaceuticals (all kinds of dosage kinds … … syrups, tablets, injectables) medical consummabables, as well as likewise biological fluids ……. Capacity around 10 kg/ hour. install a diesel discharged incinerator that can accommodate a set tons of approximately 100 kg with a day-to-day burning need of up to 500kg per 8 hour day. […]
50 to 60kg/hr and 100 to 120kg/hr diesel powered burner.1. Ability to Incinerate the Complying With Types of Waste: Family waste, glass, steel, light weight aluminum containers and also window extrudes, steel canisters (smashed), hardwood, tires, white goods, plastic containers, pressure packs, medical waste as well as quarantine waste. 2. Needed Blazing Capacity: Around 4,500 […]
Main unit Application For incineration, general and pathological Capacity 50 – 60 kg/h burn rate Type Two combustion chambers type; primary and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unit Operating time Minimum 8 hours daily Operating temperature From 850 0C to 1200 0C, Automatic controlled Residual Ash […]
Load Capacity minimum: 1500 kg Burner fuel type: Diesel Burner fuel rate max.: 20-25 Liter diesel/ per hour Burners minimum: 3 Burning rate minimum: 200-300kg/per hour Furnace bar area minimum: 2 м3 Fuel tank capacity minimum: 300L Main chamber burning temperature min. 1100 0C Afterburner chamber burning temperature min. 1300 0C Power supply 220V Incinerator […]
Gasified incineration for burning clinical wastes. Gas kind: Natural Gas Burning Capacity: –– 30-50 kg/time –– Daily 3-6 times Burner size: max 2000x1200x3200 mm Burning room volume: –– Gasification space max 0.7 m3, –– Additional burning area max 0.5 m3 , Dimension of the filling up entry: max 650×× 850 mm Air blower: max 0,5 […]
Burner Kind: Containerized, gasoline Burning Rate:100–– 120kg/hour. Minimum Operating Temperature:850 o C( primary combustion). Maximum Operating Temperature:1450 oC( Afterburner chamber). Additional Burning Capacity: Compulsory. Thickness Insulation:20 mm High. Refractory Spreading: Minimum 65mm. Sturdy refracting lining to withstand:1500 oC. Typical stress out time: maximum:3 humans resources. Fuel kind: Diesel. Fuel Consumption in L/hr:7.5 to 9. Home […]
*Double combustion chambers *Smoke filter chamber and S.Steel chimney *Italy Riello Oil burner and PLC Auto. control *Heavy duty mobile trailer with safe parts *Minimal installation *Mobile by truck tractor 1. Should be Trailer mounted Trailer Type 2. Be able to burn Medical waste 100-200kgs per hour 3. Diesel diesel oil type 4. 220 V single phase […]
Main burning Diesel/LPG/LNG burning key combustion chamber/primary combustion zone Second burning Home time in the second chamber not less than 2 secs Both key as well as the secondary temperatures preserved up until all the waste has actually been completely ignited Chimney Chimney with a minimal height of 4 meters above ground level Minimum leave […]
INCINERATOR DESCRIPTION The Model is for up to 300kgs ability per batch tons as well as will certainly shed at around 55kgs per hour. The unit has leading packing style and has a strong refractory concrete lining for optimum heat retention. Device have large leading cover for very easy loading, as well as specifically designed […]
Incinerator model A. Burn Rate 65kg/h minimum. Weight (kg), please suggest:. Secondary Chamber. Gas Retention Time – – 2 Seconds. Fuel – Diesel/LPG/LNG, please suggest. Power Supply for – Control Box – 220V-240V 50Hz single phase. Minimum operating temperature level 850 ° C, please suggest. One year Spare Components Package for complete maintainability. 10m Pipe […]