Category: Uncategorized

US EPA Receives New NOI RE: New Notice of Intent to Sue EPA The U.S. Environmental Protection Agency has recently received a notice of intent to sue (NOI) that may be of interest to you. The Clean Air Act NOI is submitted pursuant to 42 U.S.C. § 7604(b)(2) for failure to review and revise certain […]
waste incinerator 每天更新 ⋅ 2019年9月6日 新闻 Dealing with sea spewing syringes, stolen hospital waste and inefficient incinerators DAWN.com The one day in the last five months that 17-year-old Abdul Rafiq decided to sleep in and not report for work, was the day he missed all the excitement … 标记为不相关 Rising demand on Surgical Waste Management Market […]
Technical specification for burning machine 1.Two systems are required to be installed in the south of the Kingdom of Saudi Arabia. The two systems will be used by custom authority to  burn different kinds of drugs. All need equipment must be provided. 2.Warrantee:  booth systems must be provided with 3 years warrantee from the date of acceptance. All needed spare parts, preventative  maintenance repair and corrective maintenance must be included in the cost and provided to the customer. 3.All needed electric and water connections must be provided. 4.Both systems must be of high quality and must be environmental friendly. 5.The capacity of each system should be up to 100 kg/hr. 6.The system must have automatic feeding. 7.Each system must consists of two burning  rooms, one primary room for burning the drug and another room for burning the gases  that emit as  a result of primary burning.  8.The oven must be made of steel that is rust resistance and with thickness not less than 6 mm. 9.Each system must be of high efficient in burning different kinds of drugs, and should have 99.9% efficiency for burning organic materials. 10.Waste products should not exceed 5%. 11.System must have automatic ignition system.  12.System should use diesel (HSD) as fuel and should not consume more than  8 to 10 lt/hr .  13.Each system should be provided with fuel tank  of size adequate to operate the system for one full day. 14.The temperature in the primary room should be 850 C ± 50 C. the system should also be capable to operate up to 1050 C ± 50 C. the system  should be capable of continues operation and should be provided with cement layer insulator with adequate thickness. 15.Oven should be provided with heat insulator to allow easy operation. 16.Gas should remain in the secondary room for not more than 1.5 second. 
waste incinerator 每天更新 ⋅ 2019年9月5日 新闻 Recycling 'may be burnt in waste incinerator' if no deal Brexit happens Gloucestershire Live Recycling such as plastic and paper may be burnt in Gloucestershire's waste incinerator if Britain leaves the European Union without a deal, a district … 标记为不相关 Relying on landfills is not an option The CT Mirror […]
waste incinerator 每天更新 ⋅ 2019年9月4日 新闻 Potential landfill expansion would nearly double truck traffic in Boyertown The Mercury Earl and Berks get $2 for each ton of waste dumped in the landfill. … Rolling Hills is authorized to accept municipal solid waste, incinerator ash, … 标记为不相关 Korean firms promote 'eco-friendly' incinerator in PHL pna.gov.ph TACLOBAN CITY […]
SPECIFICATIONS OF THE MEDICAL/BIOLOGICAL WASTE  INCINERATOR It should  be  a three chambered incinerator  The load capacity of 250 kg The housing for the incinerator should be able to withstand the temperatures and other operational requirements. The chimney should have a strong refractory lining of special type of cement to withstand temperatures more than 1200oc. It should have a strong base for the machine to keep it stable, firm and secure during its operational lifespan. The primary (combustion) and the secondary (scorching) chambers to be fitted with burners for effective combustion. In the third chamber, scrubbers and precipitators will need to be installed as pollution control equipment before emission of gases into the atmosphere. A system for continuous emission Monitoring and Environmental Monitoring. A mechanism with which to treat the waste water before discharge into the sewerage system. Temperature control and monitoring devices (probe thermometer) should be availed to ensure that the right temperatures are attained in the chambers during operation. Motor (fans) sufficient to induce enough air into the combustion chambers and direct the gases towards the flue 9 chimney). High power electricity and emergency generator connection for automated ignition purposes. The chimney should be tall enough and be at least one meter above the tallest building in the vicinity. The fuel tank (industrial diesel) to be constructed next to but out side the incinerator housing for security purposes and to prevent fire hazards. Capacity of 250. Other Requirements Training of all the personnel involved in health care waste (HCW) management. The Automatic Feeding system of the Incinerator Automatic waste loading mechanism with conveyor belts. These will lead the waste into the first primary chamber. An Automatic bottom ashes discharge system.
Spare part list – Ignition burner                          Item description                   N0 of required                             Motor                                       2                          Control box                              2                           Pump couplings                       4                          Photo cells                               2                          Sets ht. leads                           2                          Sets electrodes                         4                          Oil valve                                   1                          Nozzle                                       2                                                             Spare part list – After burners                          Item description                   N0 of required                             Motor                                       2                          Control box                              2                           Pump couplings                       4                          Photo cells                               2                          Sets ht. leads                           2                          Sets electrodes                         4                          Oil valve                                   1                          Nozzle                                       2 Spare part list – Ram loader                           Item description                   N0 of required                         Reed switch                               4                        Seal kit                                       1      Medical waste incinerator Accessories  – Clean out tools – Loading and ash removal methods.      – Fuel storage tank with the two pump and all accessories.  – Flue gas cleaning system – Stack discharge. –      Medical waste incinerator civil work – Construct incinerator foundation     – Provide stack support     – Provide open steel structure room for the incinerator.     Medical waste incinerator submittal shall include:- -Detail installation drawing – Incinerator and auxiliary product data      – Test reports      – Certificates like CE, ISO, LR, AFNOR, TUV and UL.      – Energy analysis report      – Project experience       – Pollution control equipment emission rate.      – Noise level limitation.      – Quality assurance       – Guarantee        
SPECIFICATIONS OF THE MEDICAL/BIOLOGICAL WASTE  INCINERATOR It should  be  a three chambered incinerator  The load capacity of 250 kg The housing for the incinerator should be able to withstand the temperatures and other operational requirements. The chimney should have a strong refractory lining of special type of cement to withstand temperatures more than 1200oc. It should have a strong base for the machine to keep it stable, firm and secure during its operational lifespan. The primary (combustion) and the secondary (scorching) chambers to be fitted with burners for effective combustion. In the third chamber, scrubbers and precipitators will need to be installed as pollution control equipment before emission of gases into the  atmosphere. A system for continuous emission Monitoring and Environmental Monitoring. A mechanism with which to treat the waste water before discharge into the sewerage system. Temperature control and monitoring devices (probe thermometer) should be availed to ensure that the right temperatures are attained in the  chambers during operation. Motor (fans) sufficient to induce enough air into the combustion chambers and direct the gases towards the flue 9 chimney). High power electricity and emergency generator connection for automated ignition purposes. The chimney should be tall enough and be at least one meter above the tallest building in the vicinity. The fuel tank (industrial diesel) to be constructed next to but out side the incinerator housing for security purposes and to prevent fire  hazards. Capacity of 250. Other Requirements Training of all the personnel involved in health care waste (HCW) management. The Automatic Feeding system of the Incinerator Automatic waste loading mechanism with conveyor belts. These will lead the waste into the first primary chamber. An Automatic bottom ashes discharge system.
CONTACT: Soledad Calvino (News Media Only) [email protected] 415-972-3512 FOR IMMEDIATE RELEASE September 3, 2019 U.S. EPA awards close to $8 million to protect and restore San Francisco Bay and its watersheds SAN FRANCISCO – The U.S. Environmental Protection Agency (EPA) has awarded almost $8 million in grants to protect and restore wetlands and streams in […]
Spesifikasi Incinerator 200kg/jam Spesifikasi dan Daftar Material Dimensi dan Power Capacity Nama Barang                                : INCINERATOR Type / Model                 : PWR-INC-KMN 20 Kapasitas                                 : 200kg/Jam (2 m3) Length                               : 384 cm   Width                                : 182 cm   Height                                    : 213 cm   Height of Chimney std            : 700 cm   TOTAL WEIGHT                   : 9.500 kg  Panel – timer                 : Digital Included Auto Alarm Finishing                            : Hot endured paint  Fuel tank                           : 200 Liter  Covering Element from steel   : 3-8mm  Banyaknya Burner                   : 3 pcs   Banyaknya Blower               : 2 pcs  Max. Fuel consumption           : 15-40 Liter/Jam  Max. Elektric consumption   : 1300 Watt   Bahan bakar               : Kerosene / Diesel (solar)   Voltage                              : 220 V / 1 phase / 50 Hz   Material  1. PANEL CONTROL Type                       : Digital  Buatan                    : Local KAMINE ( Panel dan Incinerator satu Merek) Voltage                   : 220 V / 1 phase / 50 Hz   Safety operator       : Emergency Stop  System                    : Microkontroller  Pengoperasian         : Semi Automatic Temperatur control  : Digital Coupler Type Control panel : Manual dan automatic Tipe : Self Standing Type / Wall Mounted Type Material  : Mild steel Thermocontrol : 2 (Dua)  1200 ºC Set of timer : 0- 2 jam Tombol saklar […]