Burning Capacity: 125 kg minimum/time (3-6times/day), double chamber, double combustion system Imputing door Mouth Width (mm): 760*760 (approx.) Chimney External Diameter (mm): 300 ± 10 Combustion Improver Device: 0.11kw, Fuel consumption: 7kg/ hour (max) Re-Burning Device: Oil consumption: 5kg/h, 0.37kw, Oil consumption: 10-20kg/h Voltage: 380v/220v AC, Warranty: 1 Year, 50 Hz Per your advertisement for […]
Capacity: 20KG/Hr, Temp Range: 600 Deg. C – 1100 Deg. C Fuel Supply: Natural Gas/Diesel Dual Combustion Chamber Complete Scrubbing System (Dual Resultant Gas Washer), Dual Blower, Chimney Height: 8m Electric Supply: 220/240Volt, Single Phase 1.    Type of waste: Trash 2.    Any other type: 3.    Quantity of waste generated per day in kg: (50 Ton […]
Major components are – Ethanol, Paraffin, Silicon, Aluminium chloro hydrate, Bentone ,LPG quote for incinerators for industrial chemical wastes treatment, 1 burning rate must be Average 30kgs\h 2 inside of chamber material must be refractory concrete cement 3 it works in three system diesel oil\ Natural gas or LPG 4 voltage must be 220V 5 […]
Stack: Type:  Wire Supported MOC:  Mild Steel of ISstd Height :3 Meters or more • PROCESS AT LEAST 1 METRIC TON OF WASTE PER DAY • OPERABLE BY 1 PERSON, WITH NO TRAINING REQUIRED • REGULAR MAINTENANCE CAN BE COMPLETED BY 1 PERSON WITH LIMITED TRAINING • REGULAR MAINTENANCE SHOULD NOT EXCEED 1-HOUR PER DAY […]
Primary Combustion Chamber Waste Charging Door: Provided with refractory lining with sealing gaskets Ash Removed Door: Provided with refractory lining with sealing gaskets Outer Body MOC: Mild Steel, 5mm Primary Chamber: Stainless Steel Operating Temperature :800. ± 50◦C Insulation: Insulation Brick Heating Elements Type: Kanthal Al Grade Power Consumption: 75 KW ( Initial Load ) […]
1. Is the residence time more than 2 seconds? 2. Is the primary and secondary air preheated? 3. Could it be provided as a continuous system? 4. Is there a monitoring system for operational parameter? (temperature) 5. Is there a data logging system? 6. Does it provide for control interventions to adjust waste feed, grate […]
Burning rate: 250 Kg/hr. It should be able to Operate not Less than 10 hours/day This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics, laboratories, institutes, etc… Design Specification: Types A, B, C, D, and E of medical waste “PYROLYTIC” combustion, by controlling the gasification of waste. The incinerator […]
GOODS:  ONE INCINERATORS IN ACCORDANCE WITH THE   SUPPLIER’     REQUIREMENT   S OWN           PROPOSED                     SPECIFICA           TION/             CONFIRM           ATION         […]
GOODS:  ONE INCINERATORS IN ACCORDANCE WITH THE   SUPPLIER’     REQUIREMENT     S OWN             PROPOSED                         SPECIFICA             TION/               CONFIRM         […]
TECHNICAL INCINERATORS SPECIFICATIONS FOR 2 hospitals   INTRODUCTION All the incinerators to be supplied and installed must meet the Government of Kenya waste Management Regulation 2006 in particular 3rdschedule regulation (26, 47) pertaining classification, standards, criteria, and procedure for installing/operating incinerators as authored by the National Environmental Management and Coordination (waste management) regulation 2006, legal […]