The panel shall comprise of a compartment for the connection of power and control cables. Passage for power cables and
control cables shall be made by the bottom part of the switchboard.
The drawer shall be locked in the isolated position by padlocks.
1.Two systems are required to be installed in the south of the Kingdom of Saudi Arabia. The two systems will be used by
custom authority to burn different kinds of drugs. All need equipment must be provided.
2.Warrantee: booth systems must be provided with 3 years warrantee from the date of acceptance. All needed spare
parts, preventative maintenance repair and corrective maintenance must be included in the cost and provided to the
customer.
3.All needed electric and water connections must be provided.
4.Both systems must be of high quality and must be environmental friendly.
5.The capacity of each system should be up to 100 kg/hr.
6.The system must have automatic feeding.
7.Each system must consists of two burning rooms, one primary room for burning the drug and another room for burning
the gases that emit as a result of primary burning.
8.The oven must be made of steel that is rust resistance and with thickness not less than 6 mm.
9.Each system must be of high efficient in burning different kinds of drugs, and should have 99.9% efficiency for
burning organic materials.
10.Waste products should not exceed 5%.
11.System must have automatic ignition system.
12.System should use diesel (HSD) as fuel and should not consume more than 8 to 10 lt/hr .
13.Each system should be provided with fuel tank of size adequate to operate the system for one full day.
14.The temperature in the primary room should be 850 C ± 50 C. the system should also be capable to operate up to 1050
C ± 50 C. the system should be capable of continues operation and should be provided with cement layer insulator with
adequate thickness.
15.Oven should be provided with heat insulator to allow easy operation.
16.Gas should remain in the secondary room for not more than 1.5 second.
17.The primary burning room should have at least 2 burners.
18.The secondary burning room should have one burner.
- Each system should have doors for ash, exit for air to the chimney and windows to allow looking inside and for
maintenance.
20.Each system should have filtering system for gas processing with 2 tanks using ordinary water. Each water tank
should have capacity of 1000 lt and should be fixed to the system and provided with water level indicator.
21.Each system should have special technology for separating waist products and humidity after gas processing.
22.Each system should have cooling capability after operation.
23.Each system m should be provided with exhaust pipe with 250 mm diameter and 10 m high. The base of the exhaust
system should be 1000 mm. The exhaust pipe should be 6 mm and should be provide with heat insulator. The exhaust
system should be provided with pressure indicator. It should also provide with ladder and Lightning Arrestor.
24.Electric power: should be 220 volt, 3 phase, 60 Hz, and the motor should not be less than 15 HP.
25.Each system should be provided with control panel and indicators and needed safety equipment and alarm systems. The
control panel should show at least temperature in both the primary and secondary rooms and injectors of the filters and
load.
26.Each system should be provided with alarm system for any breakdown or defect of any component of the system.
27.The following personal protective tools must be provide:
a.Heat resistant garments for 20 persons.