Tag: Blog

medical waste diesel incinerator Burning Rate:47.5–50kg/hour Minimum Operating Temperature:850o C(primary combustion) Maximum Operating Temperature:1450 oC(Afterburner chamber) Secondary Burning Capacity:Compulsory Density Insulation:20mm High Refractory Casting:Minimum 65mm Heavy duty refracting lining to withstand:1500 oC Average burn out time :maximum:3 hrs Fuel type:Diesel Fuel Consumption in L/hr:7.5 to 9 Residence time in secondary chamber:2sec Residue ash post 100kg:Max […]
Medical waste is currently managed via an old medical waste incinerator; which also manages the associated medical waste delivery and ash removal arrangements.Pathological waste: organs, tissues, surgical specimens, bodily fluids removed during surgery or autopsy.  Mix and moisture content not known.Allow for weekly deliveries @ 8 hour per day operation = 11 kg per hour […]
Incinerate: medical waste and general waste Capacity to burn waste: 400-500kg/hr Fuel: Diesel Fuel Consumption: 10 liters/hr maximum Incineration temperature: 950-1300 degrees centigrade Casing: thick (min 5mm) stainless steel casing and fully insulated to withstand sea humidity Voltage 220/240v or 380/415V Frequency 50Hz high-capacity, powerful, European Standard incinerator,ideal for high volume incineration,with integral after-burner for […]
Items/Model TS250(PLC) Picture Principle Waste Incineration Treatment Burn Rate Average 250 kg/hour Feed Capacity Average 400kg/feeding Control Mode PLC(Programmable Logic Controller Incinerator) Combustion Chamber 2000L Internal Dimensions 210x88x110cm Secondary Chamber 1000L Smoke Filter Chamber Yes Feed Mode Manual Voltage 220V Power 2.0Kw Oil Consumption (kg/hour) Average 24.2(DO) Gas Consumption (m3/hour) *** Temperature Monitor Digital Display […]
General specifications of a 100 kg/hr incinerator No. Description Parameter value     model   HICLOVER YD100 1 Machine working mode Oil + Power Oil + Power 2 Voltage 220V C 3 phase or 1 phase 220V 1P 3 Oil consumption (lit/hr) Average 25-32 lit/hr/chamber Average 33Liters/hour/total incinerator 3 burners 6 Incineration rate 100 kg/hr […]
MINIMUM REQUIREMENTS FOR ENGINE OF INCINERATION CAPACITY OF INCINERATION 30KG / H 1. GENERAL SPECIFICATIONS: The incinerator for medical waste must be designated for the destruction of all types of waste produced by the Center for Health (waste type hospital, clinic, medical laboratory for destructive capacity of 30kg / h) . Pyrolytic gasification combustion control […]
Incinerator Parts Mineral Insulated Thermo couple sensor K-Type 300SS K type 300SS: M27*2, 300mm Ins,2520 S.S, 2.5mm core  HICLOVER – Medical Environmental    WWW.HICLOVER.COM Waste Incinerators Medical Waste Incinerator Pet Animal Cremation Solid Waste Incinerator Tel:  +86-25-8461 0201    Mobile: +86-13813931455(whatsapp/wechat)Website: www.hiclover.com  Email: [email protected]Email: [email protected]   Nanjing Clover Medical Technology Co.,Ltd.   2020-06-27 smart
Toxic and dangerous wastes, Medical pharmaceutical and hospitable liquids  Wastes Domestic garbage Electric and electronic wastes Industrial wastes In General, all type of wastes and garbages Capacity 50-60Kg/h Combustion supporting materials Coal oil, diesel oil Temperature inside 800-10000C 1000-12000C Burning efficiency >98% Power consumption 1.3KW Noise <78dB Index of let smoke and waste gas Ringelman’s […]
Items/Model TS50M Picture   Burn Rate Average 50 kg/hour Feed Capacity Average 50-150 per feeding Control Mode PLC(Programmable Logic Controller Incinerator) Combustion Chamber 450L Internal Dimensions 75x75x80cm Secondary Chamber 225L Smoke Filter Chamber Yes Feed Mode Manual Feeding Voltage 220V Power 0.5Kw Oil Consumption (kg/hour) Average 13.3 Gas Consumption (N.G, m3n/Hour) Average 16 Gas Consumption […]
Waste type: health care waste Waste density: 125 to 350Kg/M3 Waste calorific value: 4000KCAL/kg Moisture content: 10 – 25% Estimated ash residue: 5 – 10% Nominal capacity: 50kg/hr batch load Secondary chamber: 2 [email protected]?C Environmental: NEMA ACT (EMCA) 1999, Waste Management regulations, 2006 Primary Combustion chamber: The primary combustion chamber is the main structure of […]